The 1970's law that set into place the regulation of stormwater is: - correct answer-
b b b b b b b b b b b b bb b
The Clean Water Act
b b b
Requirements for managing stormwater activity on a construction site are outlined in
b b b b b b b b b b b
the following regulation: - correct answer-NPDES
b b b b bb b
Which of the following is never an allowable stormwater discharge from a
b b b b b b b b b b b
construction site? - correct answer-Discharge from contaminated groundwater
b b b bb b b b b
The Notice of termination can filed when: - correct answer-All construction activity,
b b b b b b b bb b b b
inside and outside the building, is complete and permanent stabilization verified
b b b b b b b b b b b
Relative to stormwater permitting, all of the following must occur before construction
b b b b b b b b b b b
starts except: - correct answer-Submit the notice of termination (NOT)
b b b bb b b b b b b
Which erosion control best mgmt practice increases water infiltration, dissipates
b b b b b b b b b
rainfall energy and slows overland flow of stormwater - correct answer-Vegetation
b b b b b b b b b bb b
Of the following factors that influence erosion rates, the one a contractor has the
b b b b b b b b b b b b b
most control over is: - correct answer-Groundcover
b b b b b bb b
Temporary stabilization should be implemented - correct answer-Immediately on all
b b b b b bb b b b
disturbed areas that are likely to or will remain inactive for 14-days or more
b b b b b b b b b b b b b b
The Primary purpose of a construction exit is - correct answer-To remove sediment
b b b b b b b b bb b b b
from construction site vehicles and minimize trackout
b b b b b b b
Common types of erosion include all of the following except - correct answer-
b b b b b b b b b b bb b
Sedimentation
Which of the following is NOT a beneficial use of water? - correct answer-Flushing a
b b b b b b b b b b b bb b b
spill down a storm drain
b b b b b
When installing and maintaining a check dam make sure: - correct answer-The low
b b b b b b b b b bb b b
point (overflow) of the check dam is in the middle of the channel