100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NCCCO Test 3 Questions and Answers

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
20-01-2026
Escrito en
2025/2026

NCCCO Test 3 Questions and Answers

Institución
Nccco
Grado
Nccco









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Nccco
Grado
Nccco

Información del documento

Subido en
20 de enero de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NCCCO Test 3


The crane is out of level, you release the swing brake, the boom swings downhill, your: - Answer-Load
radius increases



Blocking can be placed under the ends of tracks to: - Answer-Increase the crane's stability when
operating over front or back.



What quadrant produces the least amount of ground pressure on a lattice crawler - Answer-Side



On lattice boom cranes fitted with power load lowering, a heavy load should be lowered by using the: -
Answer-Power load-lowering feature and the foot brake.



Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effect - Answer-
Overturning the crane or collapsing the boom.



When the boom handle is released to its center position, which action should be expected - Answer-The
boom hoist will be held stationary.



On a lattice boom crawler crane, the main boom length is measured from the: - Answer-Center of the
boom heel pins to the center of the boom tip sheave.



If you can't level your crawler crane: - Answer-Don't operate crane.

, What effects does having crawlers retracted have on a crawler crane with a long boom - Answer-
Decrease in capacity



If your crawler crane is on a barge, it is necessary to: - Answer-Secure the crane to the barge



A pin-connected lattice boom is being dismantled. After connecting the equalizer (bridle) to the
connecting lugs on the boom, which boom connecting pins should be removed first - Answer-Lower
connection pins, located at and ahead of the equalizer.



When using a mobile crane on a barge, the crane's load capacity chart should be: - Answer-Replaced by
a list chart.



How many broken wires are permitted at the end connection of a pendant before it must be taken out
of service - Answer-1



If high winds are expected and the lattice boom crane must be secured pointing into the wind, then the
hook should be: - Answer-Secured to a solid structure directly below the boom point.



When assembling a lattice boom on most crawler cranes using different lengths, which insert section,
generally, should be closest to the boom foot - Answer-10 ft.



During assembly where should you attach slings to the lift boom - Answer-End fittings.



Which boom configuration can cause the most hazardous boom side-loading condition - Answer-Long
boom with minimum radius



When is it safe to handle loads under power lines - Answer-The load nor any part of the crane can come
closer than regulations allow
$17.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Zanaya Arizona College Of Allied Health
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
71
Miembro desde
2 año
Número de seguidores
28
Documentos
9826
Última venta
2 días hace

4.5

12 reseñas

5
8
4
2
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes