Final Exam Project Management with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Institución
Project Managememt
Grado
Project Managememt










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Project Managememt
Grado
Project Managememt

Información del documento

Subido en
18 de enero de 2026
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Final Exam Project Management with all Correct &
100% Verified Answers |Actual Complete Exam |
Already Graded A+

_____ means the project's processes and products meet written specifications.
a. Conformance to requirements
c. Project feasibility
b. Fitness for use
d. Benchmarking ✔Correct Answer-A

_____ means that a product can be used as it was intended.
a. Conformance to requirements
c. Critical chain scheduling
b. Fitness for use
d. Free slack ✔Correct Answer-B

Process improvement plan, quality metrics, and quality checklists are the outputs of the _____
process of project quality management.
a. controlling quality
c. quality certification
b. planning quality management
d. performing quality assurance ✔Correct Answer-B

A _____ is a standard of measurement in quality management.
a. milestone c. merge
b. metric d. matrix ✔Correct Answer-B

The _____ process is often associated with the technical tools and techniques of quality
management, such as Pareto charts, quality control charts, and statistical sampling.
a. quality planning c. quality assurance
b. quality certification d. quality control ✔Correct Answer-d

Performing quality assurance is a subprocess of the _____ process of project quality management.
a. initiating c. monitoring and controlling
b. closing d. executing ✔Correct Answer-D

Validated changes and validated deliverables are the outputs of the _____ subprocess of project
quality management.
a. initiating c. monitoring and controlling
b. closing d. executing ✔Correct Answer-C

_____ is a technique that helps identify which variables have the most influence on the overall
outcome of a process.

a. Design of experiments
c. Activity-on-arrow
b. Backward pass d. Crashing ✔Correct Answer-A

,_____ is the degree to which a system performs its intended function.
a. Reliability c. Maintainability
b. Validity d. Functionality ✔Correct Answer-D

_____ are the system's special characteristics that appeal to users.
a. Features c. Yields
b. Outputs d. Metrics ✔Correct Answer-A

_____ addresses how well a product or service performs the customer's intended use.
a. Reliability c. Maintainability
b. Performance d. Functionality ✔Correct Answer-B

_____ is the ability of a product or service to perform as expected under normal conditions.
a. Reliability c. Maintainability
b. Performance d. Functionality ✔Correct Answer-A

_____ addresses the ease of performing maintenance on a product.
a. Reliability c. Maintainability
b. Performance d. Functionality ✔Correct Answer-C

_____ generates ideas for quality improvements by comparing specific project practices or product
characteristics to those of other projects or products within or outside the performing organization.
a. Prototyping c. Mind mapping
b. Systems thinking d. Benchmarking ✔Correct Answer-D

_____ refers to action taken to bring rejected items into compliance with product requirements or
specifications or other stakeholder expectations.
a. A process adjustment
c. An acceptance decision
b. Rework d. Validation ✔Correct Answer-B

_____ correct(s) or prevent(s) further quality problems based on quality control measurements.
a. Process adjustments
c. Acceptance decisions
b. Rework d. Decomposition ✔Correct Answer-A

A _____ is a graphic display of data that illustrates the results of a process over time.
a. statistical sampling chart
c. Six Sigma chart
b. Pareto chart
d. control chart ✔Correct Answer-D

_____ help users to identify the vital few contributors that account for most quality problems in a
system.
a. Gantt charts c. Control charts
b. Pareto charts d. Tracking Gantt charts ✔Correct Answer-B

_____ involves choosing part of a population of interest for inspection.
a. Statistical sampling c. System testing
b. Conformance d. Fitness for use ✔Correct Answer-A

, Six Sigma's target for perfection is the achievement of no more than _____ defects, errors, or
mistakes per million opportunities.
a. 1.34 c. 34
b. 3.4 d. 13.4 ✔Correct Answer-B

Projects that use Six Sigma principles for quality control normally follow a five-phase improvement
process called _____.

a. DMAIC
c. configuration management
b. weighted scoring model
d. use case modeling ✔Correct Answer-A

Important tools used in the _____ phase of the DMAIC process include a project charter, a
description of customer requirements, process maps, and Voice of the Customer (VOC) data.
a. define c. analyze
b. measure d. improve ✔Correct Answer-A

An important tool used in the _____ phase of the DMAIC process is the fishbone or Ishikawa
diagram.
a. define c. analyze
b. measure d. improve ✔Correct Answer-C

A ____ is a bell-shaped curve that is symmetrical regarding the average value of the population (the
data being analyzed).
a. skewed distribution
c. bimodal distribution
b. normal distribution
d. degenerate distribution ✔Correct Answer-B

A(n) _____ is any instance where the product or service fails to meet customer requirements.
a. defect c. deliverable
b. yield d. variance ✔Correct Answer-A

The _____ is a measure of quality control equal to 1 fault in 1 million opportunities problems.
a. ISO 9000 c. seven run rule
b. six 9s of quality rule
d. Six Sigma rule ✔Correct Answer-B

A(n) _____ is done to test each individual component (often a program) to ensure that it is as defect-
free as possible.
a. integration test
c. user acceptance test
b. unit test
d. system test ✔Correct Answer-B

____ is an independent test performed by end users prior to accepting the delivered system.
a. Integration testing
c. User acceptance testing
b. Unit testing
d. System testing ✔Correct Answer-C
$23.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyclub Yale School Of Medicine
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
22
Miembro desde
1 año
Número de seguidores
0
Documentos
8650
Última venta
6 días hace
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Lee mas Leer menos
3.0

5 reseñas

5
2
4
0
3
1
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes