100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

C722 Project Management Study Guide – Highlighted Notes + JO’s Tips + Practice Test | Updated Version | Guaranteed Pass A+

Puntuación
-
Vendido
-
Páginas
97
Grado
A+
Subido en
18-01-2026
Escrito en
2025/2026

Pass C722 Project Management with confidence using this all-in-one, student-friendly study guide. This resource combines highlighted key concepts, JO’s proven exam tips, and a realistic practice test designed to mirror the C722 assessment structure and learning objectives. What’s Included: Highlighted, easy-to-review study guide JO’s insider tips for understanding tricky concepts Practice test with accurate answers Coverage of project lifecycle, scope, cost, risk & quality Agile vs. Waterfall methodologies Stakeholder & communication management Perfect for final review and first-time pass

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
18 de enero de 2026
Número de páginas
97
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1|Page


C722- Project Management, WGU C722 (Pre), WGU C722 Project
Management Terminology, WGU C722 Project Management
Terminology, WGU C722 Equations 2025

WGU C722 Project Management – Practice
Questions

1–10: Project Integration & Initiation

Q1: A project manager needs formal approval to begin work. Which document is required?
A: Project Charter
Rationale: Authorizes project work and gives PM authority.



Q2: A PM must balance competing demands for time, cost, and scope. This is known as:
A: Project constraints or triple constraint
Rationale: Time, cost, and scope are interdependent; changes affect other areas.



Q3: During project selection, which technique evaluates projects based on financial benefit?
A: Cost-benefit analysis
Rationale: Compares expected gains to costs for informed decision-making.



Q4: A stakeholder strongly influences project success. How should PM manage this?
A: Engage actively and communicate frequently
Rationale: High-power stakeholders require active management to prevent conflicts.



Q5: Project objectives must be SMART. “M” stands for:
A: Measurable
Rationale: Objectives need quantifiable metrics to track success.




practice exam 2026

,2|Page


Q6: Project assumptions are:
A: Conditions believed to be true
Rationale: Impacts planning and risk management; should be documented.



Q7: Early project risks are identified during:
A: Initiation
Rationale: Preliminary risk identification informs planning.



Q8: The PM is asked to justify the project’s strategic value. Best approach?
A: Align with organizational goals and benefits
Rationale: Ensures project relevance to business objectives.



Q9: Integration management ensures:
A: Cohesive coordination across processes
Rationale: Aligns all knowledge areas toward project success.



Q10: Change requests during initiation are handled by:
A: Project sponsor or integrated change control
Rationale: Controls scope and prevents uncontrolled modifications.



11–20: Scope & WBS

Q11: Which tool breaks project deliverables into smaller components?
A: Work Breakdown Structure (WBS)
Rationale: Facilitates estimating, scheduling, and assignment of tasks.



Q12: Project scope creep results from:
A: Uncontrolled changes without approval
Rationale: Leads to cost and schedule overruns.




practice exam 2026

,3|Page


Q13: Deliverable acceptance is verified in:
A: Validate Scope process
Rationale: Ensures work meets stakeholder requirements.



Q14: Scope baseline includes:
A: Scope statement, WBS, WBS dictionary
Rationale: Serves as reference for controlling scope.



Q15: A project requirement is:
A: A condition or capability needed by stakeholders
Rationale: Forms the foundation for defining scope.



Q16: A WBS dictionary includes:
A: Description, responsible party, and milestones for each work package
Rationale: Provides detailed guidance for execution and control.



Q17: Deliverables outside project scope are considered:
A: Exclusions
Rationale: Clarifies boundaries to manage expectations.



Q18: Change requests impacting scope should go through:
A: Integrated Change Control
Rationale: Ensures impact on time, cost, and quality is considered.



Q19: Decomposing tasks in WBS improves:
A: Estimation accuracy and accountability
Rationale: Smaller tasks are easier to plan and monitor.



Q20: Requirements traceability matrix links:
A: Requirements to deliverables
Rationale: Ensures all requirements are addressed.



practice exam 2026

, 4|Page




21–30: Schedule & Time Management

Q21: The first step in scheduling is:
A: Define activities
Rationale: Work must be broken into tasks before sequencing.



Q22: Sequence activities output is:
A: Network diagram
Rationale: Shows logical relationships between tasks.



Q23: The critical path method helps determine:
A: Longest path and minimum project duration
Rationale: Tasks on critical path have zero float.



Q24: Fast-tracking tasks involves:
A: Performing tasks in parallel
Rationale: Shortens schedule but increases risk.



Q25: Crashing a schedule involves:
A: Adding resources to shorten task duration
Rationale: Reduces time but increases cost.



Q26: Milestones in a project schedule represent:
A: Key events or deliverables
Rationale: Useful for progress tracking and reporting.



Q27: Free float is:
A: Delay allowed without affecting successor tasks
Rationale: Helps manage individual task flexibility.




practice exam 2026
$18.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEO808 nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1387
Miembro desde
4 año
Número de seguidores
1123
Documentos
9914
Última venta
7 horas hace
Top Nursing Exam Resources

Hi! I’m a nursing student who creates clear, accurate, and exam-ready study materials for ATI, NCLEX, and core nursing courses. My uploads include complete summaries, verified exam answers, and organized notes designed to save you time and boost your scores. Everything in my store is updated, easy to follow, and built to help you study smarter, not harder.

3.8

221 reseñas

5
107
4
35
3
36
2
11
1
32

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes