100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

COLORADO (DENVER) ACCESS CONTROL SUPERVISOR - CONTRACTOR EXAM 490_CO_D PRACTICE TEST

Puntuación
-
Vendido
-
Páginas
36
Grado
A+
Subido en
18-01-2026
Escrito en
2025/2026

COLORADO (DENVER) ACCESS CONTROL SUPERVISOR - CONTRACTOR EXAM 490_CO_D PRACTICE TEST

Institución
Engineering Technology
Grado
Engineering technology











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Engineering technology
Grado
Engineering technology

Información del documento

Subido en
18 de enero de 2026
Número de páginas
36
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

COLORADO (DENVER) ACCESS CONTROL SUPERVISOR - CONTRACTOR EXAM 490_CO_D
PRACTICE TEST

1. What is the primary purpose of an Access Control Supervisor certification in Denver,
Colorado?

A) To authorize general electrical work

B) To ensure individuals supervising the installation, maintenance, and repair of low-
voltage access control systems are qualified

C) To allow work on fire alarm systems

D) To certify locksmiths

Answer: B

Explanation: This specific certification under Denver's licensing framework is for
supervisors of access control (security) systems, ensuring they have the requisite
knowledge of codes, safety, and installation practices.



2. In Denver, which department issues the Access Control Supervisor license?

A) Denver Fire Department

B) Department of Excise and Licenses

C) Community Planning and Development (CPD)

D) Public Works

Answer: B

Explanation: The Department of Excise and Licenses (or the specific licensing division)
issues trade licenses for contractors, including Access Control Supervisors.



3. Which Denver license classification typically covers low-voltage alarm and access
control work?

A) Electrical Contractor

B) Fire Suppression Contractor

C) Low-Voltage (LV) Contractor

,D) Plumbing Contractor

Answer: C

Explanation: Low-Voltage Contractor licenses cover systems like security, access control,
telecommunications, and data, operating below a certain voltage threshold.



4. According to the National Electrical Code (NEC), what is the voltage threshold typically
defining a "low-voltage" or "power-limited" circuit for signaling and communications?

A) 24 volts

B) 50 volts

C) 100 volts

D) 600 volts

Answer: B

Explanation: NEC Article 725 (Class 1, 2, and 3 circuits) and other low-voltage articles
generally reference circuits of 50 volts or less, with specific power limitations.



5. NEC Article 725 covers:

A) Communication Circuits

B) Remote-Control, Signaling, and Power-Limited Circuits

C) Fire Alarm Systems

D) Optical Fiber Cables

Answer: B

Explanation: Article 725 is specifically for "Remote-Control, Signaling, and Power-Limited
Circuits," which includes many access control system components.



6. NEC Article 760 covers:

A) Communication Circuits

B) Remote-Control, Signaling, and Power-Limited Circuits

,C) Fire Alarm Systems

D) Optical Fiber Cables

Answer: C

Explanation: Article 760 is for "Fire Alarm Systems." It's critical to know that fire alarm work
often requires a separate, specific license.



7. Which NEC article specifically addresses the installation of wiring and equipment for
access control and burglar alarm systems?

A) Article 640

B) Article 725

C) Article 760

D) Article 800

Answer: B

Explanation: While Article 760 is for fire alarms, Article 725 is the primary article governing
power-limited circuits used in security and access control.



8. A "Class 2" circuit as defined by NEC Article 725 is:

A) A line-voltage circuit

B) A power-limited circuit that poses a reduced risk of fire and electric shock

C) A circuit that must be installed in conduit

D) A high-voltage circuit for motors

Answer: B

Explanation: Class 2 circuits have power sources with limits on voltage and current,
providing safety from fire initiation and electric shock, allowing for less restrictive wiring
methods.



9. In Denver, a permit is generally required for the installation of a new access control
system:

, A) Never, it's low-voltage

B) Only for commercial buildings

C) When required by the Building/Fire Code official; typically yes for new installations

D) Only if the cost exceeds $5,000

Answer: C

Explanation: Most jurisdictions, including Denver, require permits for low-voltage system
installations to ensure compliance with codes. The installer (or contractor) is responsible
for obtaining it.



10. The "Authority Having Jurisdiction" (AHJ) for approving an access control system
installation is typically the:

A) Equipment manufacturer

B) Building or Fire Department inspector

C) Property owner

D) System designer

Answer: B

Explanation: The AHJ is the governmental office (Building, Electrical, or Fire Department)
that enforces the code and grants final approval.



11. The primary model building code adopted by Denver is based on the:

A) Uniform Building Code (UBC)

B) International Building Code (IBC)

C) National Building Code

D) Denver Residential Code only

Answer: B

Explanation: Denver, like most of Colorado, has adopted the International Building Code
(IBC) and International Fire Code (IFC), with local amendments.
$128.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUANKADA Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
315
Miembro desde
4 año
Número de seguidores
249
Documentos
3878
Última venta
2 semanas hace
Professionalacademictutor

On this page, you find all documents, package deals, and flashcards offered by seller

3.8

43 reseñas

5
25
4
4
3
2
2
6
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes