QUESTIONS WITH CORRECT SOLUTIONS
◉ Module 9: Space Preparation
Terminate conduits that protrude through the structural floor
__________in above the surface.
A. 1
B. 4
C. 2
D. 1 to 3. Answer: 1 to 3
◉ Module 9: Space Preparation
Toggle bolts should be installed __________in from the edges of the
sheet of plywood.
A. 8
,B. 4
C. 2
D. 1. Answer: C. 2
◉ Module 9: Space Preparation
True or False: For ICT systems, A/B grade plywood can be used..
Answer: True
◉ Module 9: Space Preparation
Use a minimum __________American wire gauge, green insulated
ground wire telecommunications equipment-bonding conductor to
bond cabinets and racks.
A. 8
B. 6
C. 4
D. 2. Answer: B. 6
,◉ Module 9: Space Preparation
What is the final step when installing an outlet box?
A. Restore fire or smoke rating as applicable
B. Terminate Cables as applicable
C. Feed al cables through the box
D. Mount the box to the wall using the mounting methods applicable
to the type of box.. Answer: A. Restore fire or smoke rating as
applicable
◉ Module 9: Space Preparation
When securing equipment to a cabinet or rack, there are four
popular thread sized for mounting screws, which of the following is
NOT one of those popular sizes?
A. M6
B. M5
, C. 10-24
D. 12-24
E. 10-32. Answer: C. 10-24
◉ Module 9: Space Preparation
Design Layout Review. Answer: Rack and cabinet equipment are
defined by the amount of space they require
1 RMU ( Rack Mounting Unit ) is the minimum spacing, where 1
RMU = ≈45 mm ( 1.75 in )
Installers must be aware of the RMUs required as well as open
spaces desired for airflow or cables
◉ Module 9: Space Preparation
Cable Routing and Management Review. Answer: Cables should be
routed on the rear sides of the cabinet or rack using cable
management hardware attached to the rear of the cabinet's or rack's
vertical channels or in cable management channels mounted
vertically on the sides of the cabinet or rack.
◉ Module 9: Space Preparation