CUSP - T&D LATEST UPDATED EXAM 2025/2026 WITH COMPLETE QUESTIONS AND SURE VERIFIED SOLUTIONS GUARANTEED PASS 100% GRADED AT A + 1. As per CAN/ULC S801, on an electrical distribution overhead utility line circuit, verification of voltage absence can be achieved by: - ANSWER Using an approved voltage detector. 2. Working on an energized lattice tower requires emergency response consistent with the associated hazards. What is NOT required as part of the emergency planning: - ANSWER Daily practice of tower rescue method. 3. Working on an energized lattice tower requires emergency response consistent with the associated hazards, including: - ANSWER 1. A means to contact the operating authority to de-energize the circuit. 2. Rescue equipment readily available to quickly and safely lower the worker. 3. Regular rescue practices on tower rescue at an appropriate frequency. 4. Z259.14 wooden pole choker devices that are designed and tested to restrict a workers fall distance under dry, wet, and icy conditions are classified as: - ANSWER Type AB device. 5. The voltage limits and mechanical strength of a live line tool is best specified by: - ANSWER The manufacturers requirements. 6. Live line tools can be modified to meet the needs of the work. What is NOT an acceptable strategy for tool modification: - ANSWER A utility worker has evaluated the tool modification and approved the change. 7. Live line tools can be modified to meet the needs of the work. Acceptable strategies for tool modification include: - ANSWER 1. Changes to the tool do not violate other applicable standards. 2. The tool has been inspected and tested by a professional engineer. 3. The tool modification was approved by an engineer using applicable standards. 8. Insulating hot rope (live line rope) is tested in accordance to ASTM F1701. The purpose of this test is to: - ANSWER Determine the current leakage under dry and wet rope conditions. 9. Isolation and tagging (no locks) is acceptable on an overhead distribution circuit under some of the following conditions, EXCEPT for: - ANSWER The isolation can be operated from the ground directly at the base of a structure. 10. Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under some of the following conditions: - ANSWER 1. The isolation point is a physical and visual like a line cut or riser removed. 2. The isolation point can only be operated by the operating authority or qualified worker. 3. The isolation point is protected from unauthorized access such as vertical height spacing. 11. Consider that a circuit has been isolated, tagged and grounded. workers returning the next day must: - ANSWER Visually check grounds to verify they are in good order, secure and test for voltage. 12. For lockout purposes, energy isolating devices shall be labelled or marked using a standardized nomenclature and format to indicate their function. Identification shall include: - ANSWER The equipment type, energy type, and magnitude. 13. Utilities often use a permitting system due to special circumstances of which conventional lockout is impracticable. The following is NOT a justified approach to this process: - ANSWER The isolation points are only simple single step actions. 14. A high voltage utility or electrical company is authorized to use Complex Lockout (tag permitting) under what regulatory condition: - ANSWER A variance application has been approved by the provincial authority. 15. Utilities often use a permitting system due to special circumstances of which conventional lockout is impracticable. The following are justified approaches to this process: - ANSWER 1. The isolation points are located in remote areas with difficult or restricted access.

Mostrar más Leer menos
Institución
CUSP - T&D
Grado
CUSP - T&D










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CUSP - T&D
Grado
CUSP - T&D

Información del documento

Subido en
17 de enero de 2026
Número de páginas
24
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CUSP - T&D LATEST UPDATED EXAM 2025/2026
WITH COMPLETE QUESTIONS AND SURE
VERIFIED SOLUTIONS GUARANTEED PASS
100% GRADED AT A +



1. As per CAN/ULC S801, on an electrical distribution overhead utility line
circuit, verification of voltage absence can be achieved by: - ANSWER ✔
Using an approved voltage detector.


2. Working on an energized lattice tower requires emergency response
consistent with the associated hazards. What is NOT required as part of the
emergency planning: - ANSWER ✔ Daily practice of tower rescue method.


3. Working on an energized lattice tower requires emergency response
consistent with the associated hazards, including: - ANSWER ✔ 1. A means
to contact the operating authority to de-energize the circuit.
2. Rescue equipment readily available to quickly and safely lower the
worker.
3. Regular rescue practices on tower rescue at an appropriate frequency.


4. Z259.14 wooden pole choker devices that are designed and tested to restrict
a workers fall distance under dry, wet, and icy conditions are classified as: -
ANSWER ✔ Type AB device.


5. The voltage limits and mechanical strength of a live line tool is best
specified by: - ANSWER ✔ The manufacturers requirements.

,6. Live line tools can be modified to meet the needs of the work. What is NOT
an acceptable strategy for tool modification: - ANSWER ✔ A utility worker
has evaluated the tool modification and approved the change.


7. Live line tools can be modified to meet the needs of the work. Acceptable
strategies for tool modification include: - ANSWER ✔ 1. Changes to the
tool do not violate other applicable standards.
2. The tool has been inspected and tested by a professional engineer.
3. The tool modification was approved by an engineer using applicable
standards.


8. Insulating hot rope (live line rope) is tested in accordance to ASTM F1701.
The purpose of this test is to: - ANSWER ✔ Determine the current leakage
under dry and wet rope conditions.




9. Isolation and tagging (no locks) is acceptable on an overhead distribution
circuit under some of the following conditions, EXCEPT for: - ANSWER ✔
The isolation can be operated from the ground directly at the base of a
structure.


10.Isolation and tagging (no locks) is acceptable for an overhead distribution
circuit under some of the following conditions: - ANSWER ✔ 1. The
isolation point is a physical and visual like a line cut or riser removed.
2. The isolation point can only be operated by the operating authority or
qualified worker.
3. The isolation point is protected from unauthorized access such as vertical
height spacing.

, 11.Consider that a circuit has been isolated, tagged and grounded. workers
returning the next day must: - ANSWER ✔ Visually check grounds to verify
they are in good order, secure and test for voltage.


12.For lockout purposes, energy isolating devices shall be labelled or marked
using a standardized nomenclature and format to indicate their function.
Identification shall include: - ANSWER ✔ The equipment type, energy type,
and magnitude.


13.Utilities often use a permitting system due to special circumstances of which
conventional lockout is impracticable. The following is NOT a justified
approach to this process: - ANSWER ✔ The isolation points are only simple
single step actions.


14.A high voltage utility or electrical company is authorized to use Complex
Lockout (tag permitting) under what regulatory condition: - ANSWER ✔ A
variance application has been approved by the provincial authority.


15.Utilities often use a permitting system due to special circumstances of which
conventional lockout is impracticable. The following are justified
approaches to this process: - ANSWER ✔ 1. The isolation points are located
in remote areas with difficult or restricted access.
2. The length of time to perform the lockout is impracticable.
3. Excessive numbers of persons required to lockout.


16.Work on a distribution line must consider the following items when
performing isolation and de-energizing of the circuit.: - ANSWER ✔ 1.
Whether there are multiple sources of energy (loop feed) on the circuit.
$15.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Exchequer Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
60
Miembro desde
1 año
Número de seguidores
1
Documentos
1442
Última venta
2 semanas hace
EXEMPLARY SERVICE IN ACADEMIA EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I CAN DO ASSIGNMENTS, EXAMS,ESSAYS AND RESEARCH PROJECTS FOR YOU EVEN AT STRICT DEADLINES. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, FREE of any fee.

Lee mas Leer menos
2.8

8 reseñas

5
3
4
0
3
1
2
0
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes