1


ARE CE Tests Questions with Correct
Answers | Updated (100% Correct Answers)
Parts of a weld Answer: Leg

Throat

Face

If hazardous waste discovered during construction who pays? IE
underground storage tank Answer: Contractor pays and Owner
reimburses

-A201 states owner is responsible for remediation of hazardous
materials at project site

who has discretion to decided whether or not construction meets
design intent? Answer: architect

Costs to repair or correct work due to a design defect are payable
by Answer: the architect's professional liability insurance (errors and
omissions)

things that are included in a Life cycle cost analysis LCCA? Answer:
initial costs

maintenance costs



© 2025 All rights reserved

,2
operational costs

financing costs

are replacement costs considered in LCCA? Answer: No

just cost over lifetime of individual system

possible consequence of a dry plumbing trap? Answer: leakage of
sewer gas

make sure to distinguisher between "cause" and "consequence"
Answer: *

what consultant to deal with coaxial cable performance? Answer:
low voltage consultant

-deals with communications, security, audio, and video systems

(division 27)

who deals with high voltage systems that have a direct effect on life
safety? Answer: electrical engineer

Where to note discrepancies seen during site visit? Answer: note
the observation in a field report

Is the architect at fault for missing an incorrect dimension on shop
drawings? Answer: No


© 2025 All rights reserved

,3
Architect reviews shop drawings for design intent, and it is the
contractor's responsibility to ensure the proper dimensions

-contractor checks for proper length

Is the structural engineer at fault for missing incorrect dimensions
on shop drawings? Answer: No, same as architect

what must each bidder contractually represent? Answer: - has read
and understands provisions for liquidated damages

- must visit site

- bid is based upon the materials, equipment, and systems required
by the bidding documents without exception

three statements about privately bid projects? Answer: -owner may
open bids privately, often with arch's assist

-architect should reveal results only w/ owner approval/direction

4 points about stipulated sum contracts? Answer: -owner knows
cost at time of contract execution

-unit prices are permitted

-owner compensates contractor fixed price for work, according to
contract docs



© 2025 All rights reserved

, 4
-actual construction costs and construction bid dif are profit/loss by
the contractor

In order to properly track the progress of construction, each field
report should be... Answer: sequentially numbered

two things that should be on field report? Answer: observation date

weather conditions

-NOT schedule

contractor is compensated for direct labor, costs of subcontracts,
and material costs, as well as overhead and profit at a fixed price or
percentage - which method? Answer: cost-plus-fee

Can the architect approve minor changes without owner's consent?
Answer: Yes per AIA A201 Section 7.4

-cant add additional cost

When Party A has unfairly benefited at the expense of Party B?
Answer: Unjust Enrichment

-Under this doctrine Party B can claim restitution

Unforeseeable circumstances that prevent someone from fulfilling a
contract? Answer: force majeure



© 2025 All rights reserved

Información del documento

Subido en
16 de enero de 2026
Número de páginas
39
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Passit
3.5
(22)
Vendido
124
Seguidores
6
Artículos
14454
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes