100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

3B2 – Ultimate ABSA Study Guide C1–15 Comprehensive Q&A for Certification Success – Converted

Puntuación
-
Vendido
-
Páginas
420
Grado
A+
Subido en
16-01-2026
Escrito en
2025/2026

Complete 3B2 ABSA Study Guide covering chapters 1–15 with comprehensive questions and answers. Designed to help students and professionals reinforce knowledge, practice exam-style questions, and achieve success on the ABSA certification exam.

Mostrar más Leer menos
Institución
3B2
Grado
3B2











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
3B2
Grado
3B2

Información del documento

Subido en
16 de enero de 2026
Número de páginas
420
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

3B2 - Ultimate
2025 Exam
ABSA
Pack,
Study
Comprehensive
Guide C1-15 Questions,
Comprehensive
Verified
Q&AAnswers,
For Certification
Study GuideSuccess2025
? ?3B2 - Ultimate
Exam Pack,
ABSA
Comprehensive
Study Guide C1-15
Questions,
Comprehensive
Verified Answers,
Q&A
Page
For
Study
1 Certification
of 420
Guide ? Suc
?

1|Page


3B2 - Ultimate ABSA Study Guide C1-15 |
Comprehensive Q&A For Certification
Success

A speed sensitive governor may be:
1. Proportional.
2. Mechanical.
3. Mechanical-hydraulic.
4. Electronic-hydraulic.
a. 1,2
b. 3,4
c. 1,2,3
d. 2,3,4
e. 1,2,3,4. -correct-answer-D




In a mechanical-hydraulic governor system, what is the purpose of the auxiliary oil
pump?
a. It provides oil pressure in case of a main pump failure.
b. It provides oil pressure to the bearings.
c. It provides oil pressure to the governor system.
d. It provides oil pressure during start-up of the turbine.
e. It boosts the main pump's pressure. -correct-answer-D



3B2 - Ultimate ABSA Study Guide C1-15
2025Comprehensive
Exam Pack, Comprehensive
Q&A For Certification
Questions,Success
Verified Answers, Study Guide ? ? Page 1 of 420

,3B2 - Ultimate
2025 Exam
ABSA
Pack,
Study
Comprehensive
Guide C1-15 Questions,
Comprehensive
Verified
Q&AAnswers,
For Certification
Study GuideSuccess2025
? ?3B2 - Ultimate
Exam Pack,
ABSA
Comprehensive
Study Guide C1-15
Questions,
Comprehensive
Verified Answers,
Q&A
Page
For
Study
2 Certification
of 420
Guide ? Suc
?

2|Page




An electronic-hydraulic governor system uses:
a. High pressure oil from the turbine oil system.
b. A separate fluid power unit for high pressure oil.
c. Oil pressure of approximately 3000-4000 kPa.
d. Pressure oil from the turbine oil system and boosts it to
approximately 8200-11000 kPa.
e. Flyweights similar to a mechanical-hydraulic governor. -correct-answer-B




A mechanical overspeed trip is designed to _____ in the event of an overspeed
condition.
a. Prevent the turbine's speed from exceeding 150% of its rated speed.
b. Activate an alarm.
c. Drop the turbine's load.
d. Shut off the turbine's steam supply.
e. Throttle the inlet steam. -correct-answer-D




When starting a large condensing or extraction turbine, the lubricating oil pump is
usually started:
a. Just before the turbine is rotated.
b. One half hour before the turbine is rotated.



3B2 - Ultimate ABSA Study Guide C1-15
2025Comprehensive
Exam Pack, Comprehensive
Q&A For Certification
Questions,Success
Verified Answers, Study Guide ? ? Page 2 of 420

,3B2 - Ultimate
2025 Exam
ABSA
Pack,
Study
Comprehensive
Guide C1-15 Questions,
Comprehensive
Verified
Q&AAnswers,
For Certification
Study GuideSuccess2025
? ?3B2 - Ultimate
Exam Pack,
ABSA
Comprehensive
Study Guide C1-15
Questions,
Comprehensive
Verified Answers,
Q&A
Page
For
Study
3 Certification
of 420
Guide ? Suc
?

3|Page


c. 2-3 hours before the turbine is rotated.
d. 6-8 hours before the turbine is rotated.
e. The pump is left running at all times. -correct-answer-C




The extraction (condensate) pump is put into operation _____ the _____.
1. Before.
2. After .
3. Air ejector.
4. Jack oil pump.
5. Condenser circulating water pump.
a. 1, 3
b. 2, 3
c. 1, 4
d. 1, 5
e. 2, 5. -correct-answer-A




When starting a turbine, a speed of 200-300 rpm is maintained for what purpose?
a. To allow the barring gear time to disengage.
b. To allow the operator time to listen for rubbing or other
unusual noises.
c. To ensure all controls are functioning.




3B2 - Ultimate ABSA Study Guide C1-15
2025Comprehensive
Exam Pack, Comprehensive
Q&A For Certification
Questions,Success
Verified Answers, Study Guide ? ? Page 3 of 420

, 3B2 - Ultimate
2025 Exam
ABSA
Pack,
Study
Comprehensive
Guide C1-15 Questions,
Comprehensive
Verified
Q&AAnswers,
For Certification
Study GuideSuccess2025
? ?3B2 - Ultimate
Exam Pack,
ABSA
Comprehensive
Study Guide C1-15
Questions,
Comprehensive
Verified Answers,
Q&A
Page
For
Study
4 Certification
of 420
Guide ? Suc
?

4|Page


d. To warm up the rotor and casing.
e. To ensure the lube oil system is operating correctly. -correct-answer-D




The warm-up time required of a turbine is dependant on:
a. How quickly the turbine is required.
b. The manufacturer's instructions.
c. The size of the turbine.
d. The type of turbine.
e. Whether the steam is dry or wet. -correct-answer-C




When shutting down a turbine, the first thing done is:
a. Turn off the lube oil cooling water.
b. Test the emergency trip.
c. Start the auxiliary oil pump.
d. Shut off the steam supply.
e. Reduce the load to zero. -correct-answer-E




Sealing steam to the turbine glands is admitted _____ is put in operation
a. Before the extraction pump.
b. Before the condenser circulating water pump.




3B2 - Ultimate ABSA Study Guide C1-15
2025Comprehensive
Exam Pack, Comprehensive
Q&A For Certification
Questions,Success
Verified Answers, Study Guide ? ? Page 4 of 420
$21.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectjanine Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
5084
Miembro desde
1 año
Número de seguidores
18
Documentos
599
Última venta
2 horas hace

4.7

189 reseñas

5
160
4
20
3
3
2
0
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes