SWPPP TEST EXAM WITH QUESTIONS AND ANSWERS|| GUARANTEED PASS|| ALREADY GRADED A+ || LATEST UPDATE 2026 Temporary stabilization should be implemented A. Prior to a regulatory inspection B. Only when erosion is occurring C. Before construction activities begin D. On all disturbed areas that will likely remain inactive for 14-days or more - ANSWER-D A key first step before installing a rolled erosion control product or RECP is A. Properly preparing the ground surface B. Waiting for a good rain C. Ordering enough wood or steel posts D. Requesting agency approval - ANSWER-A Which of the following ground covers is best applied on moderate to steep slopes and in stormwater conveyances (concentrated flow) A. Rolled Erosion (RECPs) B. Seed Drilling C. Sod D. Hydroseed - ANSWER-A TRUE/FALSE Well designed, site-specific erosion and sediment control BMPs require no inspection or maintenance. - ANSWER-False What percent vegetative density is typically required for establishing final stabilization? A. 50% B. 25% C. 100% D. 75% - ANSWER-D When inspecting silt fence look for all but one of the following deficiencies A. Tears or holes in the fabric B. Trackout C. Undercutting D. Excessive sediment accumulation - ANSWER-B Which of the following is NOT a consideration when removing temporary sediment basins? A. Remove and manage saturated materials properly B. Keep the overflow or spillway intact C. Reuse rock for other applications D. Backfill, compact & stabilize basin areas - ANSWER-B If you have stormwater inlets in a constructed roadway A. Consult the project SWPPP to ensure you are protecting inlets appropriately B. Block off inlets completely to ensure sediment does not enter C. Always remove inlet protection BMPs during rain events D. Protect at all times because on-site sediment controls are expected to fail - ANSWER-A

Mostrar más Leer menos
Institución
Swppp
Grado
Swppp










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Swppp
Grado
Swppp

Información del documento

Subido en
16 de enero de 2026
Número de páginas
24
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SWPPP TEST EXAM WITH QUESTIONS AND
ANSWERS|| GUARANTEED PASS|| ALREADY
GRADED A+ || LATEST UPDATE 2026




Temporary stabilization should be implemented


A. Prior to a regulatory inspection
B. Only when erosion is occurring
C. Before construction activities begin
D. On all disturbed areas that will likely remain inactive for 14-days or more -
ANSWER-D


A key first step before installing a rolled erosion control product or RECP is


A. Properly preparing the ground surface
B. Waiting for a good rain
C. Ordering enough wood or steel posts
D. Requesting agency approval - ANSWER-A


Which of the following ground covers is best applied on moderate to steep
slopes and in stormwater conveyances (concentrated flow)


A. Rolled Erosion (RECPs)
B. Seed Drilling

,C. Sod
D. Hydroseed - ANSWER-A


TRUE/FALSE


Well designed, site-specific erosion and sediment control BMPs require no
inspection or maintenance. - ANSWER-False


What percent vegetative density is typically required for establishing final
stabilization?


A. 50%
B. 25%
C. 100%
D. 75% - ANSWER-D


When inspecting silt fence look for all but one of the following deficiencies


A. Tears or holes in the fabric
B. Trackout
C. Undercutting
D. Excessive sediment accumulation - ANSWER-B


Which of the following is NOT a consideration when removing temporary
sediment basins?


A. Remove and manage saturated materials properly
B. Keep the overflow or spillway intact

, C. Reuse rock for other applications
D. Backfill, compact & stabilize basin areas - ANSWER-B


If you have stormwater inlets in a constructed roadway


A. Consult the project SWPPP to ensure you are protecting inlets appropriately
B. Block off inlets completely to ensure sediment does not enter
C. Always remove inlet protection BMPs during rain events
D. Protect at all times because on-site sediment controls are expected to fail -
ANSWER-A


Soil stockpiles and other disturbed areas must receive


A. Permanent stabilization during the rainy season
B. Temporary stabilization if they will remain inactive for more than 30 days
C. Temporary stabilization if they will remain inactive for more than 7 hours
D. Temporary stabilization if they will remain inactive for more than 14 days
and potentially fewer days depending on the jurisdiction. - ANSWER-D


Concrete washout pits and aboveground concrete washout containers can be
used to manage


A. Concrete demolition debris
B. Empty masonry drums and bags
C. General construction site debris
D. Concrete washout from concrete trucks and related equipment - ANSWER-D


Of the following, the one that is not a valid Good Housekeeping best
management practice
$19.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
martinmwambingu54
4.0
(1)

Conoce al vendedor

Seller avatar
martinmwambingu54 Johns Hopkins University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7
Miembro desde
6 meses
Número de seguidores
1
Documentos
903
Última venta
1 mes hace
A+ EXAM ARCHIVES YOUR BLUEPRINT FOR ACADEMIC SUCCESS!

Welcome to A+ EXAM ARCHIVES – Your New Frontier for Academic Success on Stuvia! We\'re pioneering a fresh approach to study resources. We\'re dedicated to bringing you meticulously engineered, verified study solutions designed to unlock your full potential and drive remarkable academic success. Our commitment is clear: to provide cutting-edge content that is not only exceptionally clear and accurate but also strategically optimized to streamline your learning process. Whether you\'re aiming to master complex concepts, prepare for upcoming challenges, or simply seeking intelligent, reliable study tools, our curated collection of next-gen notes, agile summaries, and comprehensive learning frameworks is built to give you a distinct advantage. We understand that today\'s students need more than just information – they need effective, innovative solutions. That\'s why every document we create is thoughtfully developed to meet your specific learning requirements, ensuring you have the powerful tools to navigate your academic journey with absolute confidence. Join us at the forefront of smarter studying. Explore our store today and be among the first to experience a new level of academic support. Activate your A+ potential now!

Lee mas Leer menos
4.0

1 reseñas

5
0
4
1
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes