Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 16 páginas
Examen

MD HVAC MASTERS ACTUAL EXAM 2026 QUESTIONS SOLUTIONS GRADED A+

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

MD HVAC MASTERS ACTUAL EXAM 2026 QUESTIONS SOLUTIONS GRADED A+

Vista previa del contenido

MD HVAC MASTERS ACTUAL EXAM 2026
QUESTIONS SOLUTIONS GRADED A+

◉ A 2000 sq. ft. "Type II" dry-cleaning systems shall be provided
with an exhaust no less than __________ CFM's. Answer: 2000


◉ A bathroom in a dwelling unit must be provided with a minimum
intermittent exhaust of __________. Answer: 50 CFM


◉ A hot-water heating boiler that has a 5,000,000 BTU/HR input
shall have a minimum clearance of _____________ from the top of the
boiler to the ceiling. Answer: 3 feet


◉ A heater installed in a public garage must be installed a minimum
distance of ____________ above the floor? Answer: 8 feet


◉ ______________ is a tube or pipe used to carry refrigerant gas from
evaporator to the compressor Answer: Suction line


◉ Commercial appliance exhaust outlets that terminate above roof
shall have the discharge opening located not less than ___________
inches above the roof surface. Answer: 40

,◉ A run winding in a compressor has _____________ resistance than the
start winding. Answer: Less


◉ A duct that has an operating temperature of 150 deg F shall be
insulated to limit the exposed surface temperature to ___________.
Answer: 120 °F


◉ Hydronic pipe system should be cleaned with water and
_____________ after installation. Answer: Trisodium Phosphate


◉ Using a psychrometric chart in the Modern Refrigeration, what
will the wet bulb be if the dry bulb is 80 degrees and the humidity is
30%? Answer: 60 °F


◉ Outside air exhaust and intake openings shall be located a
minimum of ____________ feet from lot lines or building on the same
lot. Answer: 10


◉ Down - pipe support material must not promote: Answer:
Galvanic action


◉ Central HVAC systems shall have air filters installed in which of
the following locations? Answer: Upstream from any exchanger coil

, ◉ An auxiliary drain pan used in secondary drain systems for an a/c
systems shall have a minimum depth of ________ inch. Answer: 1 ½


◉ A ventilation supply system shall deliver the required rate of
supply air within an occupied space minimum of ____________ above
the floor. Answer: 3"


◉ In a unit controlled by a thermostat the differential is the
difference between ____________. Answer: Temperature at which the
switch turns the burners on and the temperature at which the
switch turns the burners off


◉ A ___________ is used to measure relative humidity by comparing
wet/dry bulb temperatures. Answer: Sling Psychrometric


◉ A (n) ___________ prevents slugging in a heat pump system. Answer:
Accumulator


◉ Any appliance in which the products of combustion at the point of
entrance to the flue under normal operating conditions have a
temperature of 1000 degrees is a ____________ appliance. Answer: Low


◉ A connector to a chimney flue shall be at least __________ the lowest
portion of the interior of the flue. Answer: 12" above

Información del documento

Subido en
15 de enero de 2026
Número de páginas
16
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GradeGalaxy
4.4
(9)
Vendido
138
Seguidores
4
Artículos
45834
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes