VERIFIED QUESTIONS AND A+ GRADED ANSWERS LATEST
UPDATED 2026\2027
The ICC catalog entry for the Special Inspector General Requirements (GR) module states that
this is an _____ exam. Indicating it is a _____ test type.
"Open Book" , navigational
Navigational means knowing where to find the answer is just as important as knowing the
answer. There is not enough time to look up every question.
The ICC catalog entry for the General Requirements (GR) module shows additional information
under _____ and _____ . Reference materials allowed during the exam are The _____ and The
_____ . This exam will focus on _____ , _____ , and _____ .
Info and Outline
International Building Code (IBC) , Special Inspection Manual (SIM)
"Duties and Responsibilities" , "Notification of Discrepancies" , and "Inspection Reports"
The type and extent of each special inspection shall be located in
the Statement of "Special Inspections"
IBC 1704.3.1
Who has the legal authority to enforce the "Special Inspections" provisions of the building
code?
building official
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"
Who can hire an approved inspection agency?
Owner or owners agent
IBC 1704.2
Who can perform a structural observation?
, Registered design professional
IBC 1704.5
Who is required to receive the final report?
Building Department
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official""
One of the TASKS performed by the special inspector AT THE JOBSITE includes posting "Stop
Work" notices for "Non-conformance" work observed.
False
SIM 2012 Ch 2 "At the Jobsite"
Who is responsible for providing access to the approved plans?
Contractor
SIM 2012 Ch 3 "Duties and Responsibilities of the Contractor"
Who shall the special inspector demonstrate competence to?
The Building Official
IBC 1704.2.1
Who can issue a "Stop Work" order?
Building Official
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"
What type of inspection is required for post-installed adhesive (epoxy) anchors placed in a
horizontal position to an existing 3000 PSI concrete wall?
Continuous inspection
IBC Table 1705.3
The Special Inspector should include their proposed solution on a Daily Inspection Report
containing "Non-conformance" items?