100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Crane Course Test Bank Complete Questions and Answers

Puntuación
-
Vendido
-
Páginas
157
Grado
A+
Subido en
14-01-2026
Escrito en
2025/2026

Crane Course Test Bank is a comprehensive resource for professionals preparing for crane operator certification and construction equipment safety exams. Includes verified multiple-choice, true/false, and scenario-based questions covering crane operation, load management, safety protocols, inspection procedures, and regulatory compliance. Designed for self-study, classroom review, and exam readiness, this resource enhances practical knowledge, safety awareness, and certification success. Updated for to reflect current OSHA standards and industry best practices.

Mostrar más Leer menos
Institución
Healthy Aging
Grado
Healthy aging











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Healthy aging
Grado
Healthy aging

Información del documento

Subido en
14 de enero de 2026
Número de páginas
157
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Academic year#//00/2026#Actual #Real Exam Questions & Verified Correct
Page
#Actual
Answers
1 of#Real
157 ? Exam
| Questions & Verified Correct Answers ? |||complete solutions..




General Crane Knowledge B, C, and E
NCCCO Study Questions and
Answers-100% Accurate.



According to ASME B30.5 regulations require a signal person to observe power line
clearances when the;

A. The crane is within a booms reach of the prohibited zone
B. When the power line is over 350kV
C. When the power line is under 200kV
None of above - ANSWER-A. The crane is within a booms reach of the prohibited zone

Static load is?

A. Sudden swinging
B. Snatching the load
C. The weight of the gross load when its stationary
D. Traveling with a suspended load - ANSWER-C. The weight of the gross load when its
stationary

Dynamic Loading is?
A. Is caused by the sudden change in speed of the lift
B. Sudden stopping
C. Swing out, snatching the load
D. All of above - ANSWER-D. All of above

According to ASME B30.5 and OSHA 1926.1400 how many wraps are required to be
kept on the drum?

A. 3
B. 4
C. 5
D. 2 - ANSWER-D. 2




1 of 157 Page 1 of 157 Page 1

,Academic year#//00/2026#Actual #Real Exam Questions & Verified Correct
Page
#Actual
Answers
2 of#Real
157 ? Exam
| Questions & Verified Correct Answers ? |||complete solutions..




According to 1926.1412 what three inspections are required?

A. Each shift, quarterly, every 4 years
B. Each shift, monthly, annual/ comprehensive
C. Day, one year, 5 year
D. None of above - ANSWER-B. Each shift, monthly, annual/ comprehensive

Eccentric reeving (unbalanced reeving) will have these effects?

A. Torque or twist of the boom
B. Side wear of sheaves
C. Increase wear of the hoist rope
D. All of the above - ANSWER-D. All of the above

When operating out of level, what boom configuration and radius reduces the crane's
capacity the most?

A. Maximum boom length and maximum radius
B. Maximum boom length and minimum radius
C. Minimum boom length and minimum radius
D. Minimum boom length and maximum radius - ANSWER-B. Maximum boom length
and minimum radius

What do some crane manufactures require for duty cycle work?

A. Reduction of crane's rated capacities
B. To be used on rubber
C. Half speed
Doesn't matter - ANSWER-A. Reduction of crane's rated capacities

Which should you take into consideration while doing duty cycle work?

A. The crane will get dirty
B. The crane will lose stability
C. The crane is stronger
D. Swing out of the load will increase the working radius - ANSWER-D. Swing out of the
load will increase the working radius

When using slings what statement below is true,




2 of 157 Page 2 of 157 Page 2

,Academic year#//00/2026#Actual #Real Exam Questions & Verified Correct
Page
#Actual
Answers
3 of#Real
157 ? Exam
| Questions & Verified Correct Answers ? |||complete solutions..




A. Don't need tags
B. Use the slings below 30 degrees
C. Increase sling angles increases the sling stresses
D. Low sling angles increase stresses of the slings - ANSWER-D. Low sling angles
increase stresses of the slings

According to B30.5, a crane operator shall have a physical examination;

A. Every three years
B. On an annual basis to align with the crane he is operating
C. Every other year depending on date of birth
D. One is not require. - ANSWER-A. Every three years

According to OSHA 1926.1411, when traveling a crane under a power line of 50kV, no
part of the crane must come within;

A. 10 feet
B. 15 feet
C. 6 feet
D. 20 feet - ANSWER-C. 6 feet

Exceeding the maximum counterweight approved by the manufacture for use on a
crane;

A. May cause structural damage
B. If the crane doesn't tip it's all good
C. May cause the crane to loose backward stability
D. May cause structural damage and/or turn over backwards - ANSWER-D. May cause
structural damage and/or turn over backwards

According to B30.5 standard the part of the load chart governed by stability is based on
what percentage of the crane's capacity when working on rubber?

A. 85%
B. 125%
C. 65%
D. 75% - ANSWER-D. 75%




3 of 157 Page 3 of 157 Page 3

, Academic year#//00/2026#Actual #Real Exam Questions & Verified Correct
Page
#Actual
Answers
4 of#Real
157 ? Exam
| Questions & Verified Correct Answers ? |||complete solutions..




According to OSHA 1926.1411, when traveling a crane under a power line of 750kV, no
part of the crane must come within;

A. 6 feet
B. 10 feet
C. 16 feet
D. 20 feet - ANSWER-C. 16 feet

What is the major effect of stopping suddenly a rapid swing while operating long boom
crane?

A. Action may cause swing brake failure
B. Action may cause the crane boom collapse and/or overturn the crane
C. Cause the hoist lines to whip out of the sheaves
D. Pendant line failure - ANSWER-B. Action may cause the crane boom collapse and/or
overturn the crane

Lifting load out of the water what is the major concern?

A. The load on the crane may increase as the object leaves the water due to the loss of
buoyancy, water held inside the object, and surface tension
B. Side loading the boom due to the wave acting of the lift
C. Water in the hoist brakes
D. Shock loading due to the wave actions of the lift - ANSWER-A. The load on the crane
may increase as the object leaves the water due to the loss of buoyancy, water held
inside the object, and surface tension

For safe crane operations there are three major items, knowing any two of these items
you compute the third. One is boom length, another is radius, the third is?

A. Gross capacity
B. Tipping conditions
C. Boom angle
D. Structural competency - ANSWER-C. Boom angle

When performing personnel hoisting the total weight of the loaded personnel platform
must not exceed what percent of the rated capacity of the radius and configuration of
the crane?

A. 85%




4 of 157 Page 4 of 157 Page 4
$21.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ALSTUDYGUIDE UNISA
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
6836
Miembro desde
1 año
Número de seguidores
9
Documentos
840
Última venta
3 horas hace

4.8

566 reseñas

5
517
4
24
3
14
2
4
1
7

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes