100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

MCB 150 Final Exam Questions and Answers| Verified

Puntuación
-
Vendido
-
Páginas
25
Grado
A+
Subido en
14-01-2026
Escrito en
2025/2026

MCB 150 Final Exam Questions and Answers| Verified

Institución
LGAV 3110
Grado
LGAV 3110










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
LGAV 3110
Grado
LGAV 3110

Información del documento

Subido en
14 de enero de 2026
Número de páginas
25
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

2026/2027
Gmail:



LGAV 3110 Final Exam Questions
and Answers| Verified
The _________ department evaluates maintenance requirements and
establishes the maintenance program for the airline.

Mechanics

Maintenance

Engineering

PP&C Ans: Engineering

An EO can be initiated due to

A reliability program alert

Work force requirement

AD, SB, or SL

All of the above Ans: All of the above

________study the practical aspects of aviation systems and
equipment while ________are trained in the basics of science and are
'problem solvers'

Designers, Avionics specialists

Technicians, Troubleshooters

Mechanics, Engineers

Maintenance Engineers, Managers Ans: Mechanics, Engineers

One of the primary functions of Engineering is

Aircraft repair

New equipment evaluation

, 2026/2027
Gmail:

Forecasting future problems

Resource management Ans: New equipment evaluation

Engineering is considered a substitute for maintenance when
mechanics are unable to solve a problem.

True

False Ans: False

PP&C controls maintenance by

Adjusting the plan and keeping checks on schedule

Creating long and short-term maintenance models for mechanics to
follow

Planning routing, variable routine, and non-routine tasks

Writing technical publications for future planning Ans: Adjusting the
plan and keeping checks on schedule

Planning and scheduling the appropriate manpower, parts and
facilities are examples of PP&C's _____ function.

Forecasting

Production

Planning

Controlling Ans: Planning

PP&C is primarily responsible for

Scheduling daily, 48-hour, and transit checks

Ordering parts and estimating the amount of labor needed for
unscheduled maintenance

Planning and scheduling all aircraft maintenance activity within an
airline

, 2026/2027
Gmail:

Providing feedback on completed maintenance jobs Ans: Planning and
scheduling all aircraft maintenance activity within an airline

Schedules for checks and known modifications are finalized in which
type of forecast?

Long-term

Intermediate term

Short-Term

Extended-term Ans: Short-Term

This PP&C function is considered an 'idealized' responsibility

Forecasting

Production

Planning

Controlling Ans: Planning

Preliminary planning consists of

Implementing maintenance actions

Developing the maintenance program by engineering

Providing feedback from mechanics to PP&C for more accurate future
planning

Coordinating with flight operations and group handling Ans:
Developing the maintenance program by engineering

What are the three primary functions of PP&C?

Production, Planning, & Control

Forecasting, Planning, & Control

Maintenance, Planning, & Control
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Ivie Southern New Hampshire University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
19
Miembro desde
8 meses
Número de seguidores
1
Documentos
8234
Última venta
2 semanas hace

3.3

6 reseñas

5
2
4
1
3
1
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes