100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CMIT Exam 2026–2027 | Updated Practice Questions, Answers & Study Guide

Puntuación
-
Vendido
-
Páginas
105
Grado
A+
Subido en
13-01-2026
Escrito en
2025/2026

Prepare for the CMIT Exam with a comprehensive 2026–2027 updated study guide designed to reinforce core information technology and management concepts. This resource includes high-quality practice questions with correct answers and detailed explanations to support exam readiness. Key topics include IT infrastructure, cybersecurity fundamentals, systems management, data handling, and professional best practices. Ideal for candidates seeking a structured and effective CMIT exam review to boost confidence and achieve success.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
13 de enero de 2026
Número de páginas
105
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1|Page


CMIT Exam (NEW UPDATED VERSION) LATEST ACTUAL EXAM QUESTIONS AND
CORRECT ANSWERS (VERIFIED QUESTIONS AND ANSWERS)- GUARANTEED PASS
A+ UPDATED 2026




A CM's role and responsibilities are governed solely by the Owner/CM Agreement.

True False - CORRECT ANSWER True



QUESTION : There are two basic forms of CM, agency and at-risk. Each form provides for the
basic services of construction management practice. However, there are some key
differences. Which of the following do not apply to both CM forms?
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
B) Both require that the liabilities and risks assumed by the parties be clearly understood,
coordinated, and stated in the respective contracts.
C) Both forms allow the CM to function in an advisory role for the entire engagement of the
CM.
D) Services can vary based on the contractual relationships of the parties and the risks that
are assumed. - CORRECT ANSWER C) Both forms allow the CM to function in an
advisory role for the entire engagement of the CM.


QUESTION : Construction management had its beginnings in the early to mid-1960's. Which
of the following factors contributed to the initial use of this delivery system?
A) The need to reduce the overall time and cost associated with project delivery.
B) The increasing cost of money and the unpredictability of project funding streams.
C) The changing role of the general contractor and the increasing numbers of specialty trade
contractors.

D) All of the above. - CORRECT ANSWER D) All of the above.




2026 2027 GRADED A+

,2|Page


QUESTION : The General Services Administration was the first federal agency to use
construction management. - CORRECT ANSWER True



QUESTION : The General Services Administration, the Department of Health, Education and
Welfare (now HHS), and the Veterans Administration ran into similar difficulties in the use of
construction management. Which of the following was/were common problems for all three
agencies?
A) Funding restrictions
B) Claims
C) Change conditions

D) All of the above - CORRECT ANSWER D) All of the above



QUESTION : CMAA was formed and incorporated 1982 with its primary focus being the
growth and development of the construction management profession. - CORRECT
ANSWER True



QUESTION : The CMAA Construction Management Standards of Practice is intended as a
guide to the range of services that constitute professional construction management. They
seek to meet the documented need for definitions of what construction management services
are, without unduly structuring the methodologies by which those services are provided by
the CM. - CORRECT ANSWER True



QUESTION : The goals of the Construction Management Association of America (CMAA)
include:
A) Setting standards and developing contract documents for construction management
practice.
B) Expanding the understanding of the construction management concept and its use in the
marketplace.
C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of
federal, state, and local governments.

D) All of the above. - CORRECT ANSWER D) All of the above



2026 2027 GRADED A+

,3|Page




QUESTION : The fact that an individual is certified or licensed in any other profession does
not, per se, establish him/her as a qualified CM.

True False - CORRECT ANSWER True



QUESTION : Certification as a CM means the construction management practitioner has
"state of the art" knowledge and capability to practice construction management.

True False - CORRECT ANSWER False



QUESTION : Recruiting and training are business matters and normally do not involve ethical
concerns.

True False - CORRECT ANSWER False



QUESTION : Construction management is a concept that is susceptible to overselling.

True False - CORRECT ANSWER True



QUESTION : Failure to provide quality services is a business and not an ethical question.

True False - CORRECT ANSWER False



QUESTION : Contracting for adequate fees is both a business and an ethical issue.

True False - CORRECT ANSWER True



QUESTION : The ethics of the CM profession focus primarily on a CM's relationships in dealing
with its clients.

True False - CORRECT ANSWER True



QUESTION : The possible approaches for delivering a project are virtually unlimited. A key
reason for such variations is:



2026 2027 GRADED A+

, 4|Page


A) The different roles that can be assumed by project participants.
B) Different forms of contracts and methods of compensation that can be used.
C) The different levels of care, responsibility, and risks assumed by the parties involved.

D) All of the above. - CORRECT ANSWER D) All of the above



QUESTION : The traditional delivery system is characterized by executing the major phases of
a project in:
A) An overlapping concept
B) A linear sequence
C) A fast track method

D) All of the above - CORRECT ANSWER B) A linear sequence



QUESTION : A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the construction phase is known before
construction starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk belongs to the contractor.

D) All of the above - CORRECT ANSWER B) Facility features are fully determined &
specified.


QUESTION : Design-build and at-risk construction management delivery systems allow the
option to fast-track or phase a project.

True False - CORRECT ANSWER True



QUESTION : Most definitions of construction management are similar. However, a contractual
definition is not known until:
A) The legal form of the CM contract is chosen.
B) The specific scope of services to be provided is identified.



2026 2027 GRADED A+
$23.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEO808 nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1387
Miembro desde
4 año
Número de seguidores
1123
Documentos
9914
Última venta
18 horas hace
Top Nursing Exam Resources

Hi! I’m a nursing student who creates clear, accurate, and exam-ready study materials for ATI, NCLEX, and core nursing courses. My uploads include complete summaries, verified exam answers, and organized notes designed to save you time and boost your scores. Everything in my store is updated, easy to follow, and built to help you study smarter, not harder.

3.8

221 reseñas

5
107
4
35
3
36
2
11
1
32

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes