Prepare for the Project Management exam with an updated 2026–2027 study guide designed to strengthen core project management knowledge and exam readiness. This resource includes high-quality practice questions with correct answers and detailed explanations aligned with current project management standards. Key topics include project life cycle, scope, schedule, cost, risk, quality, and stakeholder management. Ideal for students and professionals seeking a structured and effective project management exam review to achieve top results.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
13 de enero de 2026
Número de páginas
134
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1|Page




Project Management (NEW UPDATED VERSION) LATEST ACTUAL EXAM
QUESTIONS AND CORRECT ANSWERS (VERIFIED QUESTIONS AND ANSWERS)-
GUARANTEED PASS A+ UPDATED 2026




Project - CORRECT ANSWER A temporary endeavor undertaken to create a
unique product service or result

QUESTION : Management - CORRECT ANSWER Act ot coordinating the efforts
of people to accomplish desired goals and objectives using available resources (eg.
Money, workers, equipment, manpower)

Includes:
-Identifying requirements
-Establishing clear and achievable objectives
-Balancing the competing demands for quality, scope time and cost
-Adapting specifications, plans and concerns for the stakeholders

QUESTION : PM Characteristics - CORRECT ANSWER 1. Management is goal
oriented process
2. Multidimensional (work, people and operations)
3. A continuous process
4. Group activity
5. Dynamic function
6. Intangible force

QUESTION : Knowledge Areas - CORRECT ANSWER Scope Management
Time management
Cost management
Stakeholder management
Human resource management
Communication management
Procurement management
Risk management
Quality management
Integration management




2026 2027 GRADED A+

,2|Page


QUESTION : Project management - CORRECT ANSWER Checking planning,
organizing, motivating and controlling resources to achieve specific goals

Application of:
knowledge, skills, tools and techniques
to protect activities to meet or exceed stakeholders' expectations while using resources
efficiently and effectively

QUESTION : Project Life Cycle - CORRECT ANSWER Defines the phases that
connects the beginning of a project to its end
A project is unique

Details: Raw material extraction and processing, project manufacturing, distribution,
use, end of life

Recycle, Remanufacture, reuse/super-use

QUESTION : Direct Cost - CORRECT ANSWER Energy, materials, labor, time,
other resources

QUESTION : Indirect cost and overheads - CORRECT ANSWER Waste,
environmental damage, land use, social issues, other effects.

QUESTION : Project Phases Summary - CORRECT ANSWER

QUESTION : Initiation - CORRECT ANSWER Requirements:
-Scope
-Duration/Start
-Location
-Budget

People Involved:
-Client
-Owner
-Consultant
-PM

QUESTION : Design Phase - CORRECT ANSWER Requirements:
-Details
-Conceptual arch drawing
-Equipment
-Materials
-Technical issues (mechanical, structure)
-Drawings, materials, specs



2026 2027 GRADED A+

,3|Page


People Involved:
-Consultant
-Owner

QUESTION : Planning Phase - CORRECT ANSWER Requirements:
-Scheduling
-Plan

People Involved
-Eng
-Arch
-Civil Engineer
- Mechanical and Electrical
-PM

QUESTION : Bidding Phase - CORRECT ANSWER Requirements:
-Formal contract documents
-Contractor appointing
-Municipality approval

People involved:
-Owner
-Consultant
-PM

QUESTION : Execution Phase - CORRECT ANSWER Requirements:
-Monitoring and control for activities and processes
-Procurement
-Progress completion/payment

People involved:
-Owner
-Supervision
-Consultant
-Contractor
-PM

QUESTION : Closing Phase - CORRECT ANSWER Requirements:
-Warranty Period
-Maintenance
-Lessons learned
-Asbuilt drawings
-Checklist

People involved:
-Owner


2026 2027 GRADED A+

, 4|Page


-Supervision
-Consultant
-Contractor
-PM

QUESTION : Projects - CORRECT ANSWER Performed by people
Constrained by limited resources
Planned, executed and controlled
Temporary
Unique

QUESTION : Operations - CORRECT ANSWER Performed by people
Constrained by limited resources
Planned, executed and controlled
Ongoing
Repetitive

QUESTION : Primary objectives - CORRECT ANSWER Time, Quality, Cost

QUESTION : Secondary objectives - CORRECT ANSWER Flexibility,
sustainability, cost, risk, responsibility, certainty, complexity

QUESTION : Relation between primary and secondary objectives - CORRECT
ANSWER Time: flexibility, sustainability
Cost: risk, responsibility
Quality: certainty, complexity

QUESTION : PM Triple constraints - CORRECT ANSWER Time, cost, scope

QUESTION : Frederick Taylor - CORRECT ANSWER analyzed work patterns and
behavior and found out that better methods can increase the productivity

QUESTION : Henry Gantt - CORRECT ANSWER Studied the order of work
operations in great detail
Developed charts which details the progress in large projects
Charts used ever since

QUESTION : Project Management Institute - CORRECT ANSWER 1969
-Launched to promote project management as its own profession
-Advocacy for the profession, setting professional standards, conducting research,
providing access to info and resources
260,000 members
171 countries



2026 2027 GRADED A+
$28.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEO808 nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1387
Miembro desde
4 año
Número de seguidores
1123
Documentos
9914
Última venta
18 horas hace
Top Nursing Exam Resources

Hi! I’m a nursing student who creates clear, accurate, and exam-ready study materials for ATI, NCLEX, and core nursing courses. My uploads include complete summaries, verified exam answers, and organized notes designed to save you time and boost your scores. Everything in my store is updated, easy to follow, and built to help you study smarter, not harder.

3.8

221 reseñas

5
107
4
35
3
36
2
11
1
32

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes