1. Q: What is the Bulk Electric System (BES)? ANSWER: The BES consists of
facilities and control systems necessary for operating an interconnected electric
energy transmission network, including generation resources of 20 MVA or
greater, transmission facilities operated at 100 kV or higher, and associated
protection systems.
2. Q: What is system reliability in the context of BES operations? ANSWER: System
reliability is the ability of the electric system to supply adequate electric service
on a nearly continuous basis, with minimal interruptions over an extended time
period.
3. Q: Define transmission system adequacy. ANSWER: Transmission system
adequacy refers to the ability of the electric system to supply aggregate electrical
demand and energy requirements at all times, taking into account scheduled and
reasonably expected unscheduled outages.
4. Q: What is system security in power system operations? ANSWER: System
security is the ability of the electric system to withstand sudden disturbances such
as electric short circuits or unanticipated loss of system elements without loss of
load.
5. Q: What does N-1 contingency mean? ANSWER: N-1 contingency refers to the
capability of the electrical system to continue operating within acceptable limits
after the loss of any single system element (generator, transmission line,
transformer, etc.).
6. Q: Define load forecasting. ANSWER: Load forecasting is the process of
predicting future electrical power demand over various time horizons (short-
1|Page
,term, medium-term, and long-term) to ensure adequate generation and transmission
resources.
7. Q: What is a transmission line loading relief (TLR)? ANSWER: TLR is a NERC
procedure used to manage transmission line loadings by curtailing or redirecting
power transactions when transmission facilities become overloaded or are at risk
of overload.
8. Q: Define spinning reserve. ANSWER: Spinning reserve is the unused capacity
available from generators that are online, synchronized to the grid, and ready to
serve additional demand within a specified time frame (typically 10 minutes).
9. Q: What is non-spinning reserve? ANSWER: Non-spinning reserve consists of
offline generating units that can be started and synchronized to serve load within
a specified time frame, typically 10-30 minutes.
10. Q: Define frequency response. ANSWER: Frequency response is the automatic
reaction of the power system to balance supply and demand following a sudden
change in generation or load, primarily through governor action on generators.
11. Q: What is the difference between energy and capacity? ANSWER: Energy is the
actual production or consumption of electricity over time (measured in MWh), while
capacity is the maximum amount of power that can be produced or consumed at a
given moment (measured in MW).
12. Q: Define power factor. ANSWER: Power factor is the ratio of real power to
apparent power in an AC circuit, indicating how effectively electrical power is
being used. It ranges from 0 to 1, with 1 being ideal.
13. Q: What is reactive power? ANSWER: Reactive power is the power that
oscillates between the source and load in an AC system, measured in VARs
(Volt-Amperes Reactive). It doesn't perform useful work but is necessary for
voltage control.
14. Q: Define voltage stability. ANSWER: Voltage stability is the ability of a power
system to maintain steady voltages at all buses in the system after being subjected
to a disturbance from a given initial operating condition.
15. Q: What is a blackout? ANSWER: A blackout is the complete loss of
electrical power in a particular area, typically caused by equipment failure,
severe weather, or system overload.
2|Page
,16. Q: Define islanding in power systems. ANSWER: Islanding occurs when a
portion of the electrical grid becomes isolated from the main transmission system
but continues to operate independently.
17. Q: What is automatic generation control (AGC)? ANSWER: AGC is a system
that automatically adjusts the power output of multiple generators in response to
changes in system frequency and power interchange to maintain system balance.
18. Q: Define base load generation. ANSWER: Base load generation refers to
power plants that operate continuously to meet the minimum level of electricity
demand, typically nuclear, coal, or large hydroelectric plants.
19. Q: What is peak load? ANSWER: Peak load is the maximum electrical demand
on the system during a specific time period, typically occurring during hot summer
afternoons or cold winter evenings.
20. Q: Define load shedding. ANSWER: Load shedding is the deliberate shutdown
of electric power in parts of a power-distribution system to prevent failure of the
entire system when demand exceeds supply.
21. Q: What is a fault in electrical systems? ANSWER: A fault is an abnormal
condition in the electrical circuit, such as a short circuit, ground fault, or open
circuit, that causes current to flow outside its intended path.
22. Q: Define protection system. ANSWER: A protection system consists of
relays, circuit breakers, and other equipment designed to detect abnormal
conditions and isolate faulted equipment to maintain system stability.
23. Q: What is system inertia? ANSWER: System inertia is the stored kinetic
energy in rotating masses of synchronous generators that helps maintain system
frequency stability during disturbances.
24. Q: Define tie line. ANSWER: A tie line is a transmission line that connects two
separate electrical systems or control areas, allowing power transfer between
them.
25. Q: What is area control error (ACE)? ANSWER: ACE is a measure of the
mismatch between scheduled and actual power interchange between control
areas, used to determine the need for generation adjustment.
3|Page
, 26. Q: Define voltage regulation. ANSWER: Voltage regulation is the process of
maintaining voltage levels within acceptable limits throughout the transmission
and distribution system using various control devices.
27. Q: What is a transformer tap changer? ANSWER: A transformer tap changer is
a device that allows adjustment of the transformer's turns ratio to regulate
voltage levels, either under load (OLTC) or when de-energized.
28. Q: Define power system stabilizer (PSS). ANSWER: A PSS is a control
device that provides additional damping to generator oscillations by
modulating the generator's excitation system.
29. Q: What is the difference between real-time and day-ahead operations?
ANSWER: Real-time operations involve immediate control and monitoring of the
power system, while day-ahead operations involve planning and scheduling
resources for the next operating day.
30. Q: Define congestion management. ANSWER: Congestion management is the
process of relieving transmission constraints through various methods such as
generation redispatch, load curtailment, or transmission switching.
Section 2: System Operations and Control (Questions 31-60)
31. Q: What is the role of an Energy Management System (EMS)? ANSWER: An EMS
is a computer-based system used by system operators to monitor, control, and
optimize the performance of the electric transmission system in real-time.
32. Q: Define Supervisory Control and Data Acquisition (SCADA). ANSWER:
SCADA is a system used to monitor and control power system equipment
remotely, collecting real-time data and enabling operators to make control
decisions.
33. Q: What is state estimation in power systems? ANSWER: State estimation is a
computational process that uses real-time measurements to determine the most
likely state of the power system, providing operators with accurate system
conditions.
34. Q: Define contingency analysis. ANSWER: Contingency analysis is the
systematic study of the power system's ability to survive credible outages (N-1, N-
2, etc.) without violating operating limits.