100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CM 4101 FINAL QUESTIONS & ANSWERS

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
10-01-2026
Escrito en
2025/2026

CM 4101 FINAL QUESTIONS & ANSWERS

Institución
CM 4101
Grado
CM 4101









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CM 4101
Grado
CM 4101

Información del documento

Subido en
10 de enero de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CM 4101 FINAL QUESTIONS & ANSWERS

During which of the following process, questions such as what activities should be
scheduled are typically asked and answered?

a. Planning
b. Scheduling
c. Control - Answers -Planning

Using traditional bar charts, it is always easy to tell the logic relationships between
activities.

a. True
b. False - Answers -False

An event consumes

a. Resources
b. Time
c. Both Resources and Time
d. Neither resources nor time - Answers -Neither resources nor time

Which of the following is correct regarding CPM and PERT?

a. The calculations in CPM are non-deterministic and those in PERT are deterministic
b. The calculations in CPM are deterministic and those in PERT are non-deterministic
c. The calculations in both are deterministic
d. The calculations in both are non-deterministic - Answers -The calculations in CPM
are deterministic and those in PERT are non-deterministic

Assume A is a milestone of a project, which of the following statement(s) can be true?

a. A may take 3 days
b. A needs one mason and two helpers to finish
c. A costs $2,000
d. A can at least be crashed by 1 day
c. None of the above - Answers -None of the Above

An activity's scheduled early start time is at the beginning of day 10. Its duration is 5
days. Its total float is 7 days. If the activity is actually finished at the end of day 21,
which of the following statement(s) must be true?

a. The project will be delayed because of this activity
b. The status of this activity will not cause a possible delay to the entire project
c. The early start time of the successors of this activity will be delayed

, d. None of the above - Answers -The status of this activity will not cause a possible
delay to the entire project

The forward pass along in the Critical Path Method can be used to determine

a. Total Float
b. Activity early finish time
c. Activity late finish time
d. None of the above - Answers -Total Float

Arrow diagrams use link to represent activities

a. True
b. False - Answers -True

Choose all that are NOT true to a non-critical activity (Assume the total float of critical
activities is zero)

a. Total float is not equal to zero
b. Total float is smaller than free float
c. Free float is always equal to zero
d. Lag is always equal to zero
e. None of the above - Answers -Free float is always equal to zero;
Lag is always equal to zero

After resource leveling, the duration of a project may be changed?

a. True
b. False
c. Cannot be determined - Answers -False

A significant difference between "planning" and "scheduling" is:

a. Scheduling determines what is going to be done, and planning determines how to do
b. Scheduling determines how to do, and planning determines what to do
c. Scheduling determines when to do, and planning determines what to do, how to do,
and by whom
d. Scheduling determines how to do, and planning determines by whom - Answers -c.
Scheduling determines when to do, and planning determines what to do, how to do, and
by whom

What is not true about classic bar charts?

a. Bar charts use a time-scaled presentation
b. Bar charts often directly show resource consumption of each activity
c. Bar charts can show the relative of each activity
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUEENS Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
222
Miembro desde
3 año
Número de seguidores
180
Documentos
4152
Última venta
2 semanas hace

4.1

61 reseñas

5
35
4
10
3
8
2
3
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes