A person who engages in a business Oregon Water Resource Department (OWRD)
or activity that involves construction
new water wells must possess a
license from the:
True or False True
Prompt billing and prompt
collections make for a healthier cash
flow.
Oregon OSHA consultants WILL Issue citations or propose penalties for violations
NOT: of OSHA standards.
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 1/85
,1/10/26, 7:36 AM Oregon Construction Contractors CCB Test Exam comprehensive questions and verified answers ACTUAL EXAM 2026 TEST!! Gra…
1) Questions to answer when - All of these are questions to ask
preparing your project schedule - What equipment will be needed?
include all of these except: - How long will each task take to complete?
- What type of crew will be needed to complete
- All of these are questions to ask the activity?
- What equipment will be needed?
- How long will each task take to
complete?
- What type of crew will be needed
to complete the activity?
For Notice of Right Lien purpose, a A structure that is not used or intended for use as a
commercial improvement is defined residential building
as:
I am the residential original Mortgagee
contractor and I provide labor and
materials for the project. Who do I
need to give a notice of Right to Lien
to?
A quantity survey is also referred to Take Off
as a:
Tagout involves placing a warning On an energy-isolation device
tag:
Other than Take Off, other common Ballpark Estimates
construction estimate types include
all, except:
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 2/85
,1/10/26, 7:36 AM Oregon Construction Contractors CCB Test Exam comprehensive questions and verified answers ACTUAL EXAM 2026 TEST!! Gra…
True or False True
An on-site of host employer is
responsible for ensuring a safe place
of employment for leased or
temporary workers.
The state unemployment tax rate The history of unemployment claims against the
varies base on: employer.
Stop work order violations can result - Any of these could be the result of failure to
in: comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties
The ___________________ gives an overview Invitation to Bid
of the project, deadlines, and
general requirements.
"Job Logic" refers to: The sequence of work
True or False False
Self-employment taxes apply to all
forms of business entities.
- Money earned and money spent In the Cash Method
are accounted for in the year they
are received or paid, respectively.
The Itemized Summary is the basis A complete and accurate estimate of project costs
for: and lists all major items of work in the order they
are to be performed.
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 3/85
, 1/10/26, 7:36 AM Oregon Construction Contractors CCB Test Exam comprehensive questions and verified answers ACTUAL EXAM 2026 TEST!! Gra…
A major difference between the EIN One is federal and one is state
and the BIN is:
Poor construction and storage Molds and fungus
practices can result in _________________
inside the structure walls.
Builders now must use corrosion- Surrounding all interior bedroom doors.
resistance flashing in these specified
locations, except:
Compliance with environmental - All of these are correct
regulations can protect a contractor - Private party lawsuits
from: - Criminal and civil penalties
- Liability claims
- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims
Using the Quantity Take-Off method Labor and materials
for estimating, you begin by
estimating the cost of _________________
for each individual task.
Contractors must apply for permits Their local building department
through:
A cost effective method for JIT - Just In Time
managing material costs and
keeping inventory costs down is the:
These are materials prohibited form Unpainted and untreated scrap wood
open burning in Oregon except for:
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 4/85
Oregon Construction Contractors CCB Test Exam
comprehensive questions and verified answers
ACTUAL EXAM 2026 TEST!! Graded A+ |
2025|2026 EXAM UPDATE
Save
Terms in this set (400)
A person who engages in a business Oregon Water Resource Department (OWRD)
or activity that involves construction
new water wells must possess a
license from the:
True or False True
Prompt billing and prompt
collections make for a healthier cash
flow.
Oregon OSHA consultants WILL Issue citations or propose penalties for violations
NOT: of OSHA standards.
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 1/85
,1/10/26, 7:36 AM Oregon Construction Contractors CCB Test Exam comprehensive questions and verified answers ACTUAL EXAM 2026 TEST!! Gra…
1) Questions to answer when - All of these are questions to ask
preparing your project schedule - What equipment will be needed?
include all of these except: - How long will each task take to complete?
- What type of crew will be needed to complete
- All of these are questions to ask the activity?
- What equipment will be needed?
- How long will each task take to
complete?
- What type of crew will be needed
to complete the activity?
For Notice of Right Lien purpose, a A structure that is not used or intended for use as a
commercial improvement is defined residential building
as:
I am the residential original Mortgagee
contractor and I provide labor and
materials for the project. Who do I
need to give a notice of Right to Lien
to?
A quantity survey is also referred to Take Off
as a:
Tagout involves placing a warning On an energy-isolation device
tag:
Other than Take Off, other common Ballpark Estimates
construction estimate types include
all, except:
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 2/85
,1/10/26, 7:36 AM Oregon Construction Contractors CCB Test Exam comprehensive questions and verified answers ACTUAL EXAM 2026 TEST!! Gra…
True or False True
An on-site of host employer is
responsible for ensuring a safe place
of employment for leased or
temporary workers.
The state unemployment tax rate The history of unemployment claims against the
varies base on: employer.
Stop work order violations can result - Any of these could be the result of failure to
in: comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties
The ___________________ gives an overview Invitation to Bid
of the project, deadlines, and
general requirements.
"Job Logic" refers to: The sequence of work
True or False False
Self-employment taxes apply to all
forms of business entities.
- Money earned and money spent In the Cash Method
are accounted for in the year they
are received or paid, respectively.
The Itemized Summary is the basis A complete and accurate estimate of project costs
for: and lists all major items of work in the order they
are to be performed.
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 3/85
, 1/10/26, 7:36 AM Oregon Construction Contractors CCB Test Exam comprehensive questions and verified answers ACTUAL EXAM 2026 TEST!! Gra…
A major difference between the EIN One is federal and one is state
and the BIN is:
Poor construction and storage Molds and fungus
practices can result in _________________
inside the structure walls.
Builders now must use corrosion- Surrounding all interior bedroom doors.
resistance flashing in these specified
locations, except:
Compliance with environmental - All of these are correct
regulations can protect a contractor - Private party lawsuits
from: - Criminal and civil penalties
- Liability claims
- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims
Using the Quantity Take-Off method Labor and materials
for estimating, you begin by
estimating the cost of _________________
for each individual task.
Contractors must apply for permits Their local building department
through:
A cost effective method for JIT - Just In Time
managing material costs and
keeping inventory costs down is the:
These are materials prohibited form Unpainted and untreated scrap wood
open burning in Oregon except for:
https://quizlet.com/1128948445/oregon-construction-contractors-ccb-test-exam-comprehensive-questions-and-verified-answers-actual-exam-2026-te… 4/85