100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Foreman Test 1 & 2 with all Correct & 100% Verified Answers |Latest Update |Already Graded A+

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
10-01-2026
Escrito en
2025/2026

Foreman Test 1 & 2 with all Correct & 100% Verified Answers |Latest Update |Already Graded A+

Institución
Foreman
Grado
Foreman









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Foreman
Grado
Foreman

Información del documento

Subido en
10 de enero de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Foreman Test 1 & 2 with all Correct & 100% Verified
Answers |Latest Update |Already Graded A+

Which of the following would be considered a primecontractor? ✔Correct Answer-D. A contractor
with whom the project owner has established a contract.

Which of the following correctly identifies what is included in legitimate labor costs? ✔Correct
Answer-D. Hourly wages, fridge benefit packages, payroll taxes insurance and safety costs, and small
tools and consumables

Which in the following best illustrates the PRIMARY role of a foreman? ✔Correct Answer-B. To
Effectively manage and lead the crew

As a foreman what should ALWAYS be your FIRST priority when planning a job? ✔Correct Answer-
D. Keeping the crew actively engaged in completing their work

As a foreman what should ALWAYS be your FIRST priority when planning of a project? ✔Correct
Answer-B. Developing a job strategy before the job begins

Which of the following describe the purpose of Short Interval Planning or Look ahead planning?
✔Correct Answer-A. Breaking the job into small manageable pieces

Which of the following is the FIRST thing a foreman must do before beginning to plan a job?
✔Correct Answer-A. Read all the project-related documents

Which of the following provides the BEST example of prefabrication? ✔Correct Answer-A. To
Create a product in the shop and install it in the field

Which of the following is NOT required on a daily log? ✔Correct Answer-C. The work completed by
the individual crew members

Which of the following is NOT likely to lead to improved material handling? ✔Correct Answer-D.
Have all the materials and equipment delivered at the beginning of the job

Which of the following purchasing procedures is MOST likely to reduce material handling time?
✔Correct Answer-A. Bag and Tag all materials as appropriate

What should a foreman do if damage to he/she is discovered AFTER the delivery driver has left the
job site? ✔Correct Answer-C. Notify the Project manager and note the damage on the daily log.

Which of the following location represents the BEST place to store job site materials in a manner that
enhance says productivity? ✔Correct Answer-D. As close to the point of installation as possible

With which of the following costs should a foreman be MOST concerned? ✔Correct Answer-A.
Labor

Which of the following is NOT considered a DIRECT job cost? ✔Correct Answer-D. Home office
overhead

, An ______ occurs when any condition or document modifies the work as defined in the contract
during the BIDDING process ✔Correct Answer-B. Addendum

Where can the requirements for "Job Close Out" be found? ✔Correct Answer-B. Within the
contract documents.

During the course of a project you have noticed that there is a greater than normal number of
Change orders being submitted. Which of the following is the MOST important step that you need to
take? ✔Correct Answer-C. Maintain an accurate job log in case specific questions are asked about
why the project was completed in ways it was.

A "Log Book" is the most appropriate place to document which of the following? ✔Correct Answer-
A. The events that occurred on the job site each day.

Certain steps are typically followed when starting a job. Among those listed below which of the
following options correctly identifies the order these steps should be completed? ✔Correct
Answer-C. Sketch, Layout, Order Material, Install.

When is the BEST time for a foreman to hold information sharing "Toolbox Safety Talks" ✔Correct
Answer-D. Regularly on a weekly basis to address safety issues and learn about new tools or
materials

The bid documents associated with your project state, "Do not remove or disturb and asbestos
containing material. You have 3 days before a planned outage to remove a 12" insulated gate valve
that you suspect has asbestos covering. What should you do? ✔Correct Answer-C. Contact your
supervisor for proper procedures and instructions on how you should proceed.

While creating the rough layout for a piping project, you discover a problem with the 2" Hot Water
Supply and Hot Water return piping. By following the design specifications you determine that these
pipes will be interfering with the sheet metal subcontractors ductwork. Which of the following
actions should the piping foreman take? ✔Correct Answer-B. Report the interference to your
project manager

As general rule, when is the BEST time for a foreman to schedule effecting meetings with their work
crew? ✔Correct Answer-C. At the beginning of the shift.

Which of the following represents an effective way to ensure that the job is progressing within the
allowed budget? ✔Correct Answer-D. Keep a log of man used hours and compare it to the
percentage of the job completed.

Assumes that each of those steps below must be taken at some point when ordering materials.
A. Call Supply House with Lists.
B. Make a drawing.
C. List Materials'
D. Call for availability and prices ✔Correct Answer-A. B,C,D,A

Which of the following is a true statement with respect to a foremans responsibility related to his or
she crew? ✔Correct Answer-D. The foreman is responsible for anything that occurs at the job site
from the beginning of the workday/shift to the end of the workday/shift

After piping a water system, what is the FIRST step that should be taken? ✔Correct Answer-A. Test
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Stuvia2026 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
13
Miembro desde
8 meses
Número de seguidores
0
Documentos
4018
Última venta
1 semana hace
"Your trusted Hub for Academic Excellence"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you're preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Lee mas Leer menos
3.0

1 reseñas

5
0
4
0
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes