100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Project Management Test 1 with Complete Solutions

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
09-01-2026
Escrito en
2025/2026

Project Management Test 1 with Complete Solutions

Institución
Project Management
Grado
Project Management









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Project Management
Grado
Project Management

Información del documento

Subido en
9 de enero de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Project Management Test 1 with
Complete Solutions

What are some defining characteristics of projects? - ANSWER-1. An established
objective(goals)
2. A defined life span with a begining and end
3. The involvment of several departments and professionals (Specialized teams for
different tasks)
4.Doing things that hve never been done before(accomplishing someting "new"/unique)
5.Specific time, cost, and performance requirements(these are what evaluations
involve)

what a project is not - ANSWER-not everyday work, not routine, repetitive work.
Projects are done only once!

The project life cycle - ANSWER-Defining stage, planning stage, Executing stage,
Closing stage

Defining Stage - ANSWER-Specifications of the project are otlined,objectives,team
formation, responsibilities assigned

Planning Stage - ANSWER-plans developed to determine what the project will entail,
scheduling, and quality level/budget

Executing stage - ANSWER-Major portions of the work takes place(ie the bridge is
produced) time/cost used for control. Forecast, revisions, changes needed etc.

Closing Stage - ANSWER-delivering the project, redeploying project resources (re-
assigning), and post project reviews(assessing performance etc)

• What reasons account for the increasing importance of Project Management? -
ANSWER-1. Compression of the product life cycle
2. Knowledge explosion
3. Trple bottom line
4. Corporate Downsizing
5. Increased Customer Focus

1. Compression of the product life cycle - ANSWER-(The fast rate of life for new
products ie: xbox-xbox 360 etc NO ROOM FOR ERROR

, 2. Knowledge explosion - ANSWER-(new knowledge expands complexity so the need
for new methods is evident)

3. Trple bottom line - ANSWER-(planet, people, profit- environmental concerns= can't
just focus on profit maximization)

4. Corporate Downsizing - ANSWER-(project management is replacing middle
management- outsourcing is done, and more responsibilities rely on project managers)

5. Increased Customer Focus - ANSWER-(Increased competition= the need for more
value creation-customization for specific needs= closer relationships needed)

The two dimensions of the project management process are - ANSWER-Sociocultural
and Technical

Sociocultural Dimension elements include - ANSWER-Leadership, Problem solving,
Teamwork, Negotiation, Politics, Customer expectation (relationship interactions)

Technical Dimenssion elements include - ANSWER-Scope, WBS, Schedules, Resource
allocation, status reports (functions)

"works well with others" - ANSWER-Refers to the # 1 criterion for CIO's - Strong
communication and interpersonal skills is necessary.

Four activities of the strategic management process - ANSWER-1. Review and define
the organizational mission
2. Set long-range goals and objectives (BASED OFF SWOT
3. Analyze and formulate strategies to reach objectives
4. Implement strategies through projects

SW - ANSWER-internal

OT - ANSWER-external

Bread and butter projects (Top left) - ANSWER-Highly feasible(easy-low value
involve evolutionary improvements to current products and services(software
upgrades/cost reduction efforts)

Pearls(top right) - ANSWER-easy--good profit value
represent commercial advances using technology

oyster(bottom right) - ANSWER-Hard to make (low feasibility) but generate good profit
value

White elephant - ANSWER-low feasibility(hard to make)--low profits
$19.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ALVINK2022 University of Oxford
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
244
Miembro desde
3 año
Número de seguidores
157
Documentos
9705
Última venta
1 semana hace

4.3

83 reseñas

5
51
4
17
3
7
2
2
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes