100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

RTPM LATEST 2026 TEST PAPER QUESTIONS AND ANSWERS GRADED A+

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
09-01-2026
Escrito en
2025/2026

RTPM LATEST 2026 TEST PAPER QUESTIONS AND ANSWERS GRADED A+

Institución
Rtpm
Grado
Rtpm









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Rtpm
Grado
Rtpm

Información del documento

Subido en
9 de enero de 2026
Número de páginas
13
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

RTPM LATEST 2026 TEST PAPER QUESTIONS AND
ANSWERS GRADED A+
✔✔What is the delivery method whereby the owner contracts with a single entity? -
✔✔The design build

✔✔Who comprises the DB team? - ✔✔General contractor, subcontractor and a design
professional.

✔✔In the DB scenario, who do the design professionals work for? - ✔✔The contractor

✔✔Construction overlaps with design in which delivery process? - ✔✔Design Build

✔✔What is the delivery method in which the construction manager contracts to deliver a
project within a guaranteed maximum price? - ✔✔CMAR - Construction manager at risk

✔✔What is a way to organize project teams to work in a more creative and productive
manner - integrating all aspects of the design and construction process into a single
team effort? - ✔✔IDP - Integrated project delivery

✔✔What uses a three pronged platform: owner, design professionals, and contractors?
- ✔✔IDP - Integrated project delivery

✔✔Who is the core group that manages the IPD process? - ✔✔Owner, design pro and
the contractor

✔✔95. When does contractor mobilization and materials purchasing occur? - ✔✔the
beginning of the project

✔✔96. The planning and scheduling of construction begins
___________________________. - ✔✔Once the owners and contractors agree on the
plan

✔✔97. True or False: The owner can terminate a contract without cause. - ✔✔True

✔✔98. During construction, whose role includes inspection and observation of the work;
ensuring that the work complies with the contract documents? - ✔✔Architect

✔✔99. Whose role is it to review submittals, interpret the contract documents, and
modify the contract documents as required? - ✔✔Architect

✔✔100. Who coordinates construction activities and is in charge of the construction
site? - ✔✔The CM

, ✔✔101. Whose primary role during the construction phase is the complete the work? -
✔✔The GC and subcontractor

✔✔102. Who is responsible for obtaining permits? - ✔✔The GC and subcontractor

✔✔103. Who is responsible for arranging required tests? - ✔✔The GC and
subcontractor

✔✔104. Who is responsible for maintaining record documents? - ✔✔The GC and
subcontractor

✔✔105. Who is responsible for preparing submittals? - ✔✔The GC and subcontractor

✔✔106. Who is responsible for maintaining a clean and safe work environment? -
✔✔The GC and subcontractor

✔✔107. Who is responsible for correcting any work rejected by the owner's
representative? - ✔✔The GC and subcontractor

✔✔108. List the three types of contracts: - ✔✔Stipulated sum, cost plus fee, unit price

✔✔109. What type of contract is the result of negotiations between the owner and
contractor - ✔✔Stipulated sum

✔✔Most low-bid contracts are ___________ contracts. - ✔✔Stipulated sum

✔✔What type of contract has a shared savings clause or incentives for early
completion? - ✔✔Cost plus fee

✔✔112. This form of contract often leads to value engineering that can generate
savings during the construction phase of the building. - ✔✔Cost plus fee

✔✔113. What type of contract is used when the actual scope of work cannot be
determined at the time of the bid? - ✔✔Unit price

✔✔114. What is the key to obtaining effective bids? - ✔✔Unit price

✔✔115. List the eight commonly required forms during construction administration. -
✔✔notice to proceed, meeting minutes, request for information, field order, proposal
request, change order request, change order, punch list
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
182
Miembro desde
1 año
Número de seguidores
7
Documentos
24136
Última venta
3 días hace
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reseñas

5
14
4
6
3
7
2
0
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes