RC completes RT assessments of SOL/IROL violations how often
Answer- 30 minutes
Once BA/TOP notifies RC of emergency conditions, RC has how long
to notify other BA/TOP's and neighboring RC's
Answer- 30 minutes
Unplanned evacuation from BES control center facility is reportable by
BA/TOP/RC if it lasts longer than...
Answer- 30 minutes
Complete loss of communication (including backup) is reportable if it
lasts longer than...
Answer- 30 minutes
,Planned or unplanned telemetering & control equipment outages of more
than how many minutes but be reported
Answer- 30 minutes
Default ramp rate for Western Interconnection interchange schedules
Answer- 20 minutes
When BA unable to calculate ACE > 30 minutes, they have how long to
report to RC
Answer- 15 minutes
Default disturbance recovery period (time to return ACE to 0 following
a disturbance, DCS)
Answer- 15 minutes
Congestion management requests in Eastern Interconnection from one
RC to another must be implemented how quickly
Answer- 15 minutes
, Voltage deviation of >/= 10% nominal is reportable after how long
Answer- 15 minutes
Uncontrollable loss of firm load for how long is reportable (previous
year’s peak demand >3000; >/+300mw - otherwise 200mw)
Answer- 15 minutes
Transmission & generator data including status, output capability,
output, phase angle settings, aver status, etc. should be updated every
how many minutes
Answer- 10 minutes
If BA denies interchange, they have how long to notify RC
Answer- 10 minutes
Default ramp rate for for Eastern Interconnection interchange schedules
Answer- 10 minutes