SOLUTIONS CONFIRMED
◍ Which activity happens in the Inspect and Adapt Workshop?
A) A retrospective of the iteration
B) Planning the next PI
C) A demo of the integrated system
D) Refreshing the Program Backlog. Ans: A demo of the integrated
system
◍ When is the system demo conducted during program execution?
A) At the end of every iteration
B) On demand
C) Midway through the Program Increment
D) When Features are done. Ans: At the end of every iteration
◍ Which statement is true about iteration planning?
A) It is required for every iteration to enable fast learning cycles
B) It is only required for every third iteration
C) It is required for component teams but may not be required for
feature teams that have no dependencies on other teams
D) It is not required for teams that consistently meet their PI
Objectives. Ans: It is required for every iteration to enable fast
learning cycles
,◍ A user story includes which three things? (Choose three)
A) How
B) Why
C) What
D) Where
E) Who
F) When. Ans: Who, What, and Why
◍ A decrease in variability leads to an increase in what?
A) Predictability
B) Risk
C) Cost
D) Length. Ans: Predictability
◍ What is the one key benefit of a Backlog Refinement session?
A) It allows the team to state the problem and then think about, what
where when and impact
B) It serves a variety of purposes, including a dedicated time for
planning, retrospective, exploring and innovating
C) It is the main way in SAFe for achieving relentless improvement
D) It provides time to identify dependencies and issues that could
impact the next iteration. Ans: It provides time to identify
dependencies and issues that could impact the next iteration
, ◍ What are two behaviors of an effective Scrum Master? (Choose
two)
A) To focus on their own objectives and limit interaction with Product
Owner
B) To work with stakeholders and subject matter experts to define the
Epic and its potential benefits
C) To act as a servant leader and exhibit Lean-Agile leadership
D) To ensure no changes are made to the scope during an iteration
E) To facilitate the teams progress toward the iteration goals. Ans: To
act as a servant leader and exhibit Lean-Agile leadership and to
facilitate the teams progress towards the iteration
◍ What statement is true about features and stories?
A) Features should be small enough to fit into an iteration
B) Each feature should have at least five stories
C) Features can be larger than an iteration but Stories should be small
enough to fit into an iteration
D) Stories can be broken into features. Ans: Each feature should have
at least five stories
◍ Which statement defines the purpose of Iteration Planning (IP)?
A) It is to break stories into tasks that are achievable in the team's
capacity
B) It is to explore and implement program Epics and split them into
Features to be further explored