Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

CON 367 FINAL EXAM SCRIPT 2026 COMPLETE QUESTIONS AND SOLUTIONS

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

CON 367 FINAL EXAM SCRIPT 2026 COMPLETE QUESTIONS AND SOLUTIONS

Vista previa del contenido

CON 367 FINAL EXAM SCRIPT 2026
COMPLETE QUESTIONS AND SOLUTIONS


◉VE during design phase . Answer: some public sector laws and
regulations require formal value analysis during design


◉VE during construction phase . Answer: contractor performs VE and
suggests changes that will increase value to the project


◉Results in a Value Engineering Change Proposal ( VECP) . Answer:
The contractor submits to the owner and if the owner accepts the
contractor splits the cost savings


◉Causes of changes . Answer: Changes in project design, differing site
conditions, impact of work by other contractors, acceleration request by
owner


◉Types of Changes . Answer: Directed and Constructive


◉Directed change . Answer: the owner directs the contractor to
perform work that is different than specified in the original contract ; can
be a disagreement over the price/ time of changes

, ◉Constructive change . Answer: result of an action or lack of action of
the owner or its agent that can be construed as a change even though the
owner did not issue a formal change


◉3 elements should be satisfied to establish a constructive change .
Answer: Change, order, notice


◉Five broad categories of constructive changes . Answer:
Disagreements over contract requirements, defective specifications,
acceleration, undisclosed information, owner non-cooperation


◉change clause . Answer: contractor is obliged to perform requested
changes and owner is obliged to make equitable adjustments to the
contract price and time


◉bilateral change order . Answer: agreement executed by the owner
and the contractor detailing the change and the equitable adjustmen


◉unilateral change order . Answer: directive executed by the owner to
authorize the contractor to perform the changed work. Price and time
extension for change have yet to be determined


◉forward pricing . Answer: the cost of performing the changed work is
determined before the work is performed ; contractor is paid fixed
amount even if unanticipated costs arise

Información del documento

Subido en
5 de enero de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EddieJessup
3.5
(2)
Vendido
20
Seguidores
1
Artículos
7992
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes