CON 367 ACTUAL EXAM PAPER 2026
QUESTIONS WITH ANSWERS GRADED A+



◉T/F In lump-sum contracts, the Owner assumes the risk of cost.
Answer: F


◉T/F Typically, the Design Reviewer has the ultimate responsibility and
authority to make executive decisions related to matters affecting time
and money in a construction project. Answer: F


◉T/F In the Design-Build project delivery system, the Owner has
separate contracts with the Designer and the Contractor. Answer: F


◉T/F The Resident Project Representative should stop the work of the
Contractor when the work is not performed according to the drawings
and specifications. Answer: F


◉Which of the following should not be performed by the Resident
Project Representative for inspections?
-Providing instructions directly to subcontractors
-Following up the work that requires corrections
-Approving the work that meets the contract requirements

,-Ensuring that all work activities of contractor are inspected daily
Answer: Providing instructions directly to subcontractors


◉Which of the following is not true for the construction diary?
-Entries should be made on a weekly basis (i.e., at the -end of each
week)
-Every working day should be reported even if no work is performed
-There should be page numbers on every page
-It should be in ink if it is handwritten Answer: Entries should be made
on a weekly basis (i.e., at the end of each week)


◉T/F Ambiguous language in a contract is interpreted against the party
who selected the language or supplied the contract. Answer: T


◉T/F According to Spearin Doctrine, when the contractor exactly
follows the detail specifications and drawings, she/he will not be
responsible for unsatisfactory results in the end product. Answer: T


◉T/F Shop drawings can be change orders Answer: F


◉Which one of the following is not an element of the Contract as we
discussed in class?
Promise
Offer

, Acceptance
Consideration Answer: Promise


◉Which of the following is not a condition where a contract will not be
enforced by courts?
Duress
Unconscionability
Illegality
Seniority Answer: Seniority


◉Fill in the blank in the following statement: Some contracts must be in
writing under the ____________ as adopted by each state:
Statute of Frauds
Statute of Limitations
Resource Conservation and Recovery Act
Davis Bacon Act Answer: Statute of Frauds


◉T/F RFI (Request for Information) is the document that is transmitted
to the General Contractor from the Designer to get clarifications with
respect to design drawings and specifications. Answer: F


◉T/F The resident project representative should not supervise, direct, or
control the contractor's means and methods of performing work.
Answer: T

Información del documento

Subido en
5 de enero de 2026
Número de páginas
24
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EddieJessup
3.5
(2)
Vendido
20
Seguidores
1
Artículos
7992
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes