WGU C722- Project Management, WGU C722 (Pre), WGU C722 Project Management Terminology, WGU C722 Equations .... Comprehensive Resource To Help You Ace … Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!! 1. Which two processes are considered iterative processes? - ANSWER (1)Planning (2) Executing 2. Which activity is accomplished as part of the planning process of a project? - ANSWER Finalizing the project budget 3. Which activity is accomplished as part of the planning process of a project? - ANSWER Finalizing the project schedule 4. Which activity is accomplished during the closing process of a project? - ANSWER Reconciling the vendor accounts 5. Which activity is performed during the creating part of the initiating process? - ANSWER Drafting the project charter 6. Which activity is accomplished as part of the executing process of a project? - ANSWER Implementing the project plan 7. Which process involves determining who the project's stakeholders are? - ANSWER The initiating process 8. What information does this resource histogram display that can help during the planning phase of the project? - ANSWER Opportunities to level resource usage patterns 9. Which tool could a project manager use to ensure that the project team will address the items that are important when developing and defining the project's scope? - ANSWER Checklist A project manager wants to understand and document the approvals that must be obtained for each work package in the work breakdown structure (WBS). 10. Which tools document the approval requirements for each work package? - ANSWER (1) Project statement of work (SOW) (2) Requirements traceability matrix (RAM)

Mostrar más Leer menos
Institución
WGU C722 Project Management
Grado
WGU C722 Project Management











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C722 Project Management
Grado
WGU C722 Project Management

Información del documento

Subido en
5 de enero de 2026
Número de páginas
95
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU C722- Project Management, WGU C722
(Pre), WGU C722 Project Management
Terminology, WGU C722 Equations
Comprehensive Resource To Help You Ace
2026-2027… Includes Frequently Tested
Questions With ELABORATED 100% Correct
COMPLETE SOLUTIONS

Guaranteed Pass First Attempt!!

Current Update!!


1. Which two processes are considered iterative processes? - ANSWER (1)
Planning (2) Executing


2. Which activity is accomplished as part of the planning process of a project?
- ANSWER Finalizing the project budget


3. Which activity is accomplished as part of the planning process of a project?
- ANSWER Finalizing the project schedule


4. Which activity is accomplished during the closing process of a project? -
ANSWER Reconciling the vendor accounts

,5. Which activity is performed during the creating part of the initiating
process? - ANSWER Drafting the project charter


6. Which activity is accomplished as part of the executing process of a project?
- ANSWER Implementing the project plan


7. Which process involves determining who the project's stakeholders are? -
ANSWER The initiating process


8. What information does this resource histogram display that can help during
the planning phase of the project? - ANSWER Opportunities to level
resource usage patterns


9. Which tool could a project manager use to ensure that the project team will
address the items that are important when developing and defining the
project's scope? - ANSWER Checklist

A project manager wants to understand and document the approvals that must
be obtained for each work package in the work breakdown structure (WBS).


10.Which tools document the approval requirements for each work package? -
ANSWER (1) Project statement of work (SOW) (2) Requirements
traceability matrix (RAM)


11.The general manager of a hotel has asked for a project to put in new
landscaping around the building. The project manager has constructed a
high-level work breakdown structure (WBS) for the project, which is
provided below.

,WBS ID Description
Landscaping
a. Plans
b. Site preparation
c. Sprinklers
d. Sidewalks and curbing
e. Planting
Which activity would it be logical to add to the approved high-level WBS to
provide more detail on the work to be accomplished? - ANSWER 1.5.1 Lay
sod


12.A state college is launching a library building project. The project manager
has constructed a work breakdown structure (WBS) for the project. A few
elements from the WBS are shown in the table below (the WBS ID numbers
and indentations of the descriptions are intentionally omitted).
WBS ID Description
? Library project
? Facility needs
? Academic plan
? Stakeholder input
? Building proposal
? Siting
? Fundraising
? Potential donor list
? U.S. donors
? Florida donors

, Which two WBS elements of this project are on the same level as each other?

Choose 2 answers - ANSWER (1) Building proposal (2) Fundraising


13.A firm begins its strategic business initiative of developing a new business
model that will allow the firm to deliver an efficient, tailored service to its
customers. To accomplish this, the firm initiates a business management
project. Which aspect of project management applies to this firm's project?
- ANSWER Interdependent Tasks


14.A firm begins its strategic business initiative of developing a new business
model to enhance its competitiveness. What can be identified as a strategic
business initiative for this firm? - ANSWER Improvement in product
design


15.A firm begins a strategic business initiative of developing a new business
model that will allow the firm to deliver an efficient, tailored service to its
customers. - ANSWER Project sponsor



16.Which group is included in the five process groups? - ANSWER Closing
process group



17.What does PRINCE2 stand for? - ANSWER PRojects IN a Controlled
Environment


18.Which PMBOK process group is described as the delivery part of project
management where the main activity happens? - ANSWER Executing
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EWLindy Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
710
Miembro desde
3 año
Número de seguidores
431
Documentos
7433
Última venta
3 días hace
EN.CY.CLO.PE.DI.A

As a Career Tutor, I understand the pressure of managing demanding coursework, exams, and practical requirements across multiple disciplines. These professionally organized revision materials are designed to support students in nursing, healthcare administration, business, information systems, Engineering, health, IT, or trade courses management programs by simplifying complex concepts and reinforcing high-yield academic content. The materials are developed to help students: Understand core theories and practical applications across Multiple Disciplines Review exam relevant content aligned with undergraduate and graduate curriculam To Strengthen critical thinking, analytical reasoning, and decision-making skills Save time with clear, structured summaries instead of overwhelming textbooks Prepare efficiently for tests, assignments, case studies, and professional exams Each resource is created with academic standards in mind, integrating real world examples, industry terminology, and evidence based concepts commonly required in professional programs. Whether you are studying nursing fundamentals, healthcare management, information systems, project management, business strategy, Engineering these materials provide focused, reliable support for academic success. These revision guides are ideal for: Nursing and allied health students Healthcare administration and public health students Business, MBA, and management students Information technology and information systems students, engineering, business, IT, or trade courses If you are looking for clear, student-friendly, exam-focused revision materials that support multiple career pathways, these resources are designed to help you study smarter, perform better, and stay confident throughout your academic journey. WISH YOU SUCCESS!!

Lee mas Leer menos
3.8

107 reseñas

5
55
4
13
3
16
2
6
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes