ICC VAPOR RECOVERY 2 ACTUAL 2026 EXAM QUESTIONS AND SOLUTIONS RATED A+

Institución
ICC VAPOR RECOVERY
Grado
ICC VAPOR RECOVERY









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC VAPOR RECOVERY
Grado
ICC VAPOR RECOVERY

Información del documento

Subido en
4 de enero de 2026
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC VAPOR RECOVERY 2 ACTUAL 2026 EXAM QUESTIONS
AND SOLUTIONS RATED A+
✔✔According to PEI RP-300 a "written scope of work" for vapor recovery installation
should include:

a. permit fees
b. construction plans
c. hours of station operation
d. applicable air district rules - ✔✔b. construction plans

✔✔Existing vapor recovery equipment may be replaced by that of another manufacturer
if:

a. certified by CARB
b. allowed by the local air district
c. the only equipment the supply house has
d. listed in the Executive Order for the vapor recovery system - ✔✔d. listed in the
Executive Order for the vapor recovery system

✔✔To be prepared for a fuel spill, a technician should have a spill kit readily available
that should include all of the following EXCEPT:

a. caution tape
b. an absorbent boom
c. a type A fire extinguisher
d. fuel-absorbent materials or pads - ✔✔a. caution tape

✔✔According to Executive Order VR 201-A, which of the following could cause a nozzle
shutoff mechanism to malfunction?

a. damaged spout O-rings
b. dispenser filter seal damaged
c. dispensing flow rate exceeds 10 gpm
d. nozzle spout not inserted into vehicle fill pipe correctly - ✔✔d. nozzle spout not
inserted into vehicle fill pipe correctly

✔✔According to Executive Order VR-201-A, breakaway reconnections must be:

a. reported to CARB within 48 hours
b. logged in the GDF Maintenance Log
c. performed by the station operator only
d. performed within 24 hours of the drive-off occurrence - ✔✔b. logged in the GDF
Maintenance Log

, ✔✔Under what condition may a vapor recovery nozzle have a dispensing rate greater
than 10 gals/minute.

a. under no condition
b. only if local air district permits it
c. only if the vapor recovery system includes a vapor processor
d. only if the vehicle fuel tank has capacity greater than 10 gallons - ✔✔a. under no
condition

✔✔According to the Vapor Recovery Equipment Defects List (VRED), any OPW 12VW
nozzle vapor escape guard (BEG) with one-half of the circumference missing or
equivalent cumulative damage is:

a. consider a defect
b. considered a violation
c. not considered a defect
d. required to be tagged out until repaired - ✔✔c. not considered a defect

✔✔A properly operating balance system nozzle will allow dispensing only when the:

a. nozzle vapor valve is closed
b. vapor processor is operational
c. nozzle boot (bellow) is compressed
d. faceplate creates a continuous seal - ✔✔c. nozzle boot (bellow) is compressed

✔✔The best reference for determining what Phase II vapor recovery equipment is
certified for use at a specific gasoline dispensing facility (GDF) is:

a. the building permit for the GDF
b. Title 17, California Code of Regulations
c. the local petroleum equipment authorized dealer
d. the CARB Executive Order applicable to the GDF's Phase II vapor recovery system -
✔✔d. the CARB Executive Order applicable to the GDF's Phase II vapor recovery
system

✔✔According to PEI RP300, all of the following methods of documenting the piping
location are recommended EXCEPT:

a. taking photos of piping layout prior to burial
b. placing marking tape or metallic locating tape in the backfill over the piping
c. sketching a pipe diagram on inside cover of vapor recovery equipment manual
d. installing a bare copper wire over the piping with ends exposed at dispenser and tank
- ✔✔c. sketching a pipe diagram on inside cover of vapor recovery equipment manual
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
182
Miembro desde
1 año
Número de seguidores
7
Documentos
24136
Última venta
6 días hace
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reseñas

5
14
4
6
3
7
2
0
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes