MA 2A HOISTING EXAM – SPRING 2026 STUDY GUIDE
& PRACTICE QUESTIONS GEADED A+
What is the total force exerted on a 4" cylinder at 1,800 psi
4x3.14=12.56 x 1,800 = 22,608 lbs of force
Where should the approved hand signals be posted
On the machine
What is the weakest part of a hydraulic system
Hoses
What causes starving of hydraulic system
Low fluid, dirty filter, leaks, linked hoses
Who has the right of way when operating equipment
Pedestrian
Lost some reasons why you would replace a hose
Broken, cracked, chafed, bulging or leaking
EDUCATIONAL SUPPORT • ACADEMIC RESOURCES • PROFESSIONAL GUIDANCE
,MINDPLUG SOLUTIONS, EMPOWERING MINDS, BUILDING FUTURES
What is considered superimposed weight around a trench or work area
Any weight that is not normally there, vehicles, spoil
If you cannot see where the work is being done, do not move unless you have what?
A signal person who has a clear view of the operation directing you
What is a tag line
A line used to control the loads being handled by hoisting equipment
When can you carry a load over someone
Never
What are the purpose of mats, steel plates and timber pads
Distribution of weight
Who is responsible for safe operation of the machine
The operator
What should you look for before starting work
EDUCATIONAL SUPPORT • ACADEMIC RESOURCES • PROFESSIONAL GUIDANCE
, MINDPLUG SOLUTIONS, EMPOWERING MINDS, BUILDING FUTURES
Soft soil, wet areas, power lines, wells, dig safe marks for other utilities
What should you do with open trenches or holes at the end of the day
Cover or backfill unless you have fencing
What should you do when working on a public way
Make area safe for public with cones, signs, caution tape, saftey vests, and arrow board
What should you do with equipment when finished for the day
Park on firm level surface, chalk wheels, secure equipment, take the keys. Shut off master
disconnect
If the actual boom length falls between values listed on load chart you should use
Next higher value
What MA code is used for hoisting
520:CMR 6:00
At what intervals should equipment be inspected
Every day do circle check, start of every shift. Every 30 days for rigging. 90 days for full
inspection