100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Med Gas Mock Exam Questions With All Correct Detailed Answers A+ Pass

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
02-01-2026
Escrito en
2025/2026

Med Gas Mock Exam Questions With All Correct Detailed Answers A+ Pass Which source shall NOT be used to power the venturri of a WAGD system? - Answer- medical air Which type of connectors shall connect the medical air compressors with their intake and outlet piping? - Answer- flexible Continuing to use an existing system that is noncompliany with the requirements of this code shall be permitted unless the _______ has determined that such use poses a distinct hazard to life. - Answer- authority having jurisdiction Cylinder and cryogenic liquid container outlet connections shall be designed as to render the attachment point ________ when removal of the outlet connection is attempted. - Answer- unusable Which of the following systems shall not be permitted to be located in an outdoor enclosure? - Answer- medical air compressor sources What is required of the alarm system if another alarm condition occurs while the audible alarm is manually silenced? - Answer- Re-initiation of the audible signal Cylinders in use and in storage shall be prevented from reaching temperatures in excess of ____________. - Answer- 125ºF Mechanical exhaust for central supply locations shall not be more than ____. - Answer- 500 cfm For purposes of this code, an oxygen enriched atmosphere is an atmosphere where to total concentration of oxygen exceeds _______ by volume. - Answer- 23.5% Locations for central supply systems shall have electrical devices protected from ___________. - Answer- physical damage Final line pressure regulators, when used for cryogenic fluid central supply systems shall be of a ________ design. - Answer- balanced The pressure in the main line of each medical gas system, the operation and condition of the source of supply and the reserve source (if any) shall be monitored at the _______ alarm - Answer- master The instrument air dew point high alarm from each compressor site will indicate at the master alarm panels when the line pressure dew point is greater than _______. - Answer- -22ºF Bulk nitrous oxide system consists of more than _________ of gas. - Answer- 3,200 lb Brazed joints shall be made using a brazing alloy that exhibits a melting temperature in excess of _________ to retain the integrity of the piping system in the event of fire. - Answer- 1000ºF Manifolds for gas cylinders shall consist of ______ equal headers; each with one average day's supply, but not fewer than _______ connections. - Answer- two - two Manifolds for gas cylinders shall actuate a(n) ___________ signal and shall activate an indicator at all _______ alarm panels to indicate when or just before changeover from One header to the other. - Answer- local - master In a medical gas system with emergency reserve, which alarm system(s) will activate when, or just before, the changeover to the reserve supply occurs? - Answer- master The gas produced by evaporation from the secondary header in a cryogenic liquid container system shall enter the supply system __________ of the final line regulator. - Answer- upstream A facility is in the planning stages of installing an emergency oxygen supply connection (EOSC). Which of these components are required at this connection? - Answer- 4 alarm connection points to monitor the truck A(n) ___________ can be used as a substitute for the EOSC at a category 1 facility. - Answer- in-building emergency reserve Final line pressure controls shall be sized to ___ of the peak calculated demand. - Answer- 100% Cryogenic fluid central supply systems up to the source valve, shall be installed in accordance with ______. - Answer- NFPA 55 Central supply systems for nitrous oxide and carbon dioxide using cylinders or portable containers shall be prevented from reaching temperatures lower than ___°F. - Answer- 20 Installers of Category 1 medical gas piping systems must be qualified to ASSE 6010. What is the certification requirement for installers of a Category 3 system? - Answer- 6010 When is the initial pressure test conducted by the installer? - Answer- after blowdown of the distribution piping

Mostrar más Leer menos
Institución
Med Gas Mock
Grado
Med Gas Mock









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Med Gas Mock
Grado
Med Gas Mock

Información del documento

Subido en
2 de enero de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Med Gas Mock Exam Questions With
All Correct Detailed Answers A+ Pass
Which source shall NOT be used to power the venturri of a WAGD system? - Answer-
medical air

Which type of connectors shall connect the medical air compressors with their intake
and outlet piping? - Answer- flexible

Continuing to use an existing system that is noncompliany with the requirements of this
code shall be permitted unless the _______ has determined that such use poses a
distinct hazard to life. - Answer- authority having jurisdiction

Cylinder and cryogenic liquid container outlet connections shall be designed as to
render the attachment point ________ when removal of the outlet connection is
attempted. - Answer- unusable

Which of the following systems shall not be permitted to be located in an outdoor
enclosure? - Answer- medical air compressor sources

What is required of the alarm system if another alarm condition occurs while the audible
alarm is manually silenced? - Answer- Re-initiation of the audible signal

Cylinders in use and in storage shall be prevented from reaching temperatures in
excess of ____________. - Answer- 125ºF

Mechanical exhaust for central supply locations shall not be more than ____. - Answer-
500 cfm

For purposes of this code, an oxygen enriched atmosphere is an atmosphere where to
total concentration of oxygen exceeds _______ by volume. - Answer- 23.5%

Locations for central supply systems shall have electrical devices protected from
___________. - Answer- physical damage

Final line pressure regulators, when used for cryogenic fluid central supply systems
shall be of a ________ design. - Answer- balanced

The pressure in the main line of each medical gas system, the operation and condition
of the source of supply and the reserve source (if any) shall be monitored at the
_______ alarm - Answer- master

, The instrument air dew point high alarm from each compressor site will indicate at the
master alarm panels when the line pressure dew point is greater than _______. -
Answer- -22ºF

Bulk nitrous oxide system consists of more than _________ of gas. - Answer- 3,200 lb
Brazed joints shall be made using a brazing alloy that exhibits a melting temperature in
excess of _________ to retain the integrity of the piping system in the event of fire. -
Answer- 1000ºF

Manifolds for gas cylinders shall consist of ______ equal headers; each with one
average day's supply, but not fewer than _______ connections. - Answer- two - two

Manifolds for gas cylinders shall actuate a(n) ___________ signal and shall activate an
indicator at all _______ alarm panels to indicate when or just before changeover from

One header to the other. - Answer- local - master

In a medical gas system with emergency reserve, which alarm system(s) will activate
when, or just before, the changeover to the reserve supply occurs? - Answer- master

The gas produced by evaporation from the secondary header in a cryogenic liquid
container system shall enter the supply system __________ of the final line regulator. -
Answer- upstream

A facility is in the planning stages of installing an emergency oxygen supply connection
(EOSC). Which of these components are required at this connection? - Answer- 4 alarm
connection points to monitor the truck

A(n) ___________ can be used as a substitute for the EOSC at a category 1 facility. -
Answer- in-building emergency reserve

Final line pressure controls shall be sized to ___ of the peak calculated demand. -
Answer- 100%

Cryogenic fluid central supply systems up to the source valve, shall be installed in
accordance with ______. - Answer- NFPA 55

Central supply systems for nitrous oxide and carbon dioxide using cylinders or portable
containers shall be prevented from reaching temperatures lower than ___°F. - Answer-
20

Installers of Category 1 medical gas piping systems must be qualified to ASSE 6010.
What is the certification requirement for installers of a Category 3 system? - Answer-
6010
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Stuviaascorers University of Washington
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
346
Miembro desde
2 año
Número de seguidores
185
Documentos
10071
Última venta
2 días hace
StuviaAscorers | Top Study Notes & Exam Solutions

Stuviaascorers – Your #1 Source for Top-Quality Study Materials! Struggling with exams? Stuviaascorers has got you covered! I provide expertly crafted study notes, summaries, past papers, and exam-ready answers to help you pass with flying colors. My materials are designed for clarity, accuracy, and success—so you can study smarter, not harder! Why Choose My Study Materials? Well-structured & easy to understand – No fluff, just what you need! Exam-focused & high-scoring content – Get straight to the point! Accurate answers & clear explanations – Learn with confidence! Save time & boost your grades – Study efficiently! Don’t leave your success to chance! Browse my documents and start acing your exams today!

Lee mas Leer menos
3.8

64 reseñas

5
30
4
11
3
11
2
2
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes