100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

MBA 742 - Module 5 Exam Questions and Answers 100% Pass

Puntuación
-
Vendido
-
Páginas
28
Grado
A+
Subido en
02-01-2026
Escrito en
2025/2026

MBA 742 - Module 5 Exam Questions and Answers 100% Pass

Institución
MBA 742
Grado
MBA 742










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MBA 742
Grado
MBA 742

Información del documento

Subido en
2 de enero de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

MBA 742 - Module 5 Exam Questions
and Answers 100% Pass

Includes the processes the processes that are required to ensure timely and

appropriate planning, collection, creation, distribution, storage, retrieval,

management, control, monitoring, and the ultimate disposition of project

information. - CORRECT ANSWER-Project Communications Managment

The process of developing an appropriate approach and plan for project

communications based on stakeholder's information needs and requirements and

available assets. - CORRECT ANSWER-Plan Communications Management

Process

The key benefit of the Plan Communications Management process is that it

provides the approach to ____ most effectively and efficiently with stakeholders. -

CORRECT ANSWER-communicate

Since the degree of project success is directly proportional to understanding and

then meeting the needs of the stakeholders, ____ becomes a critical success factor.

- CORRECT ANSWER-communication

An analytical technique to determine the information needs of the project

stakeholders through interviews, workshops, study of lessons learned from

,previous projects, etc. - CORRECT ANSWER-Communication Requirements

Analysis

When analyzing communications requirements, the project manager can consider

the number of potential communication ____ or ____ as an indicator of the

complexity of a project's communications. - CORRECT ANSWER-channels or

paths

Equation for number of communication channels - CORRECT ANSWER-= n(n-

1)/2

Where n is the number of stakeholders.

A description, analogy or schematic used to represent how the communication

process will be performed for the project. - CORRECT ANSWER-

Communication Models

A systematic procedure, technique, or process used to transfer information among

project stakeholders. - CORRECT ANSWER-Communication Methods

Who conveys a message and is responsible for making the content clear and

complete; also responsible for confirming that the receiver understands the

message correctly. - CORRECT ANSWER-Sender

Translating ideas into language, usually written or verbal language. - CORRECT

ANSWER-Encoding




COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED

, The output of encoding. - CORRECT ANSWER-Message

The means of conveying the message. Sometimes referred to as the channel. -

CORRECT ANSWER-Medium

Translating the message into meaningful thoughts and ideas. - CORRECT

ANSWER-Decoding

The recipient of the message, responsible for decoding the message and providing

feedback; responsible for making sure that the entire message is received and

understood by encoding a message back to the sender conveying that. -

CORRECT ANSWER-Receiver

Confirming receipt of the information; does not imply agreement, but only receipt.

- CORRECT ANSWER-Acknowledge

After the communication has been received and understood, the receiver may send

a message with thoughts and ideas about the message. - CORRECT ANSWER-

Feedback / Response

The ____ is responsible for making the information clear, unambiguous, and

complete so that the receiver can receive it correctly; also responsible for

confirming that the information is properly understood. - CORRECT ANSWER-

Sender

When managing communications, ____ is anything that interferes with the

transmission and understanding of the message. This can include but is not limited
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SophiaBennett Howard Community College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
133
Miembro desde
1 año
Número de seguidores
5
Documentos
9103
Última venta
1 día hace
EXAM GAME-CHANGER

Exam Questions and Answers Section : Study Like a Pro, Study Smart, Study with Sophia.

3.7

26 reseñas

5
10
4
5
3
7
2
1
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes