What would be the most appropriate means for the contractor to communicate to the project owner an unforeseen condition not identified in the soils report? A. Document the issue in the job diary B. Issue a jobsite memorandum C. Draft a construction report D. Write a formal business letter Ans D. Write a formal business letter When is the best time to distribute the working agenda to the participants of a meeting? A. As a follow-up to the meeting B. At the beginning of the meeting C. About one day after the meeting D. About one day prior to the meeting Ans D. About one day prior to the meeting

Mostrar más Leer menos
Institución
AIC
Grado
AIC











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
AIC
Grado
AIC

Información del documento

Subido en
2 de enero de 2026
Número de páginas
79
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

AIC EXAM STUDY LATEST UPDATE) REAL QUESTIONS AND
VERIFIED ANSWERS |100% CORRECT | ALREADY GRADED
What would be the most appropriate means for the contractor to
communicate to the project owner an unforeseen condition not identified
in the soils report?
A. Document the issue in the job diary
B. Issue a jobsite memorandum
C. Draft a construction report
D. Write a formal business letter Ans✓✓✓ D. Write a formal business
letter


When is the best time to distribute the working agenda to the
participants of a meeting?
A. As a follow-up to the meeting
B. At the beginning of the meeting
C. About one day after the meeting
D. About one day prior to the meeting Ans✓✓✓ D. About one day prior
to the meeting


The contractor has tasked his project engineer with developing an
agenda for a preconstruction meeting with the architect and owner. The
project engineer has received numerous emails and RFIs from
subcontractors and vendors requesting a wide range of information.
Which document is most appropriate to distinguish between appropriate
topics for the meeting and topics better addressed through other means?
A. General conditions

,B. General requirements
C. Technical specifications
D. Supplementary conditions Ans✓✓✓ B. General requirements


What is the best time to distribute the meeting minutes to the
participants?
A. At the beginning of the meeting
B. About one day after the meeting
C. About one hour prior to the meeting
D. About one day prior to the meeting Ans✓✓✓ B. About one day after
the meeting


Which of the following statements is true about the use of texting as a
means of communicating in the construction industry?
A) means of easily and effectively
documenting communication
B) Appropriate for clarifying but not for
formal direction
C) Should be completely avoided in
construction
D) Acceptable for communication if
specifically allowed in the contract Ans✓✓✓ B) Appropriate for
clarifying but not for formal direction

,A subcontractor identifies a significant discrepancy between the
architectural and structural drawings. The subcontractor immediately
meets with the general contractor at their construction trailer to discuss
the discrepancy. The general contractor agrees that this could be a
significant change depending on which of the drawings describes the
designer's intent. Which of the following actions is the most appropriate
in this situation?
A) Draft a change order proposal and arrange a meeting with the design
team and owner to resolve the conflict.
B) Draft an RFI that describes the discrepancy in detail and submit it to
the architect immediately.
C) Send a short text alerting the design team of the issue and discuss the
discrepancy in detail at the next meeting.
D) Email the engineer of record to collect relevant background
information and follow up with a formal RFI to the architect Ans✓✓✓ B)
Draft an RFI that describes the discrepancy in detail and submit it to the
architect immediately.


What are the leadership skills needed to conduct a productive meeting?
A) Planning, probing questions, responding critically, and decision
making
B) Planning, timing, coordinating, probing,
responding critically, and following up
C) Listening attentively, responding
constructively, soliciting all ideas, and matching decision making to the
situation

, D) Coordinating, listening selectively, responding critically, soliciting
supportive ideas, and adjusting decision making to the situation Ans✓✓✓
C) Listening attentively, responding
constructively, soliciting all ideas, and matching decision making to the
situation


Which of the following statements made by the indicated parties below
would least likely be made at an owner/architect/contractor progress
meeting?
A) Contractor: "There are 14 unanswered RFIs on the log."
B) Superintendent: "A third party inspector will assist the supervision of
the roofing installation."
C) Owner: "It is very likely, that change order proposal #23 will be
accepted."
D) Project manager: "The bond rate for ABC subcontractor is 1.45%"
Ans✓✓✓ D) Project manager: "The bond rate for ABC subcontractor is
1.45%"


What is a listener's retention percentage of an oral conversation?
A. 10%
B. 50%
C. 60%
D. 90% Ans✓✓✓ A. 10%


Which of the following communication methods is the most effective
way to know that the communication has been understood?
$20.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cracker Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2017
Miembro desde
3 año
Número de seguidores
1342
Documentos
47000
Última venta
2 horas hace
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

370 reseñas

5
162
4
84
3
53
2
22
1
49

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes