[Mostrar más]. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopi...
Vista previa 3 fuera de 16 páginas
Añadir al carrito. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopi...
Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is...
Vista previa 2 fuera de 11 páginas
Añadir al carritoBefore leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is...
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescop...
Vista previa 3 fuera de 16 páginas
Añadir al carrito1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescop...
Where is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Incre...
Vista previa 1 fuera de 4 páginas
Añadir al carritoWhere is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add the 
rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Incre...
Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the crane 
to the center of gravity of the load 
What applies to...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhich area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the crane 
to the center of gravity of the load 
What applies to...
Splices in rail tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish moving load 
where it was designated to go 
If load is undetermined who is to find out ...
Vista previa 2 fuera de 13 páginas
Añadir al carritoSplices in rail tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish moving load 
where it was designated to go 
If load is undetermined who is to find out ...
1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds 
in ...
Vista previa 2 fuera de 6 páginas
Añadir al carrito1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds 
in ...
When making a multiple crane lift, it is important for the operator to understand that: - The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: - Increase 
Most crane manufa...
Vista previa 1 fuera de 4 páginas
Añadir al carritoWhen making a multiple crane lift, it is important for the operator to understand that: - The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: - Increase 
Most crane manufa...
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a 
direct side load equal to what percent of the rated load? - 2% 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler 
crane is working over th...
Vista previa 2 fuera de 6 páginas
Añadir al carritoThe lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a 
direct side load equal to what percent of the rated load? - 2% 
The part of the load chart governed by stability is based on what percentage of capacity while a crawler 
crane is working over th...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller AmazingGrace. Stuvia facilitates payment to the seller.
No, you only buy this summary for $40.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now