PROJ430 Advanced Project Management

Devry University

Aquí están los mejores recursos para pasar PROJ430 Advanced Project Management. Encuentra PROJ430 Advanced Project Management guías de estudio, notas, tareas, y mucho más.

All 2 resultados

Ordenador por

Final Exam |Elaborated| PROJ430  - Advanced Project Management
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management

  • Examen • 39 páginas • 2021
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
    (0)
  • 11,93 €
  • + aprende más y mejor
Final Exam |Elaborated| PROJ430  - Advanced Project Management
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management

  • Examen • 39 páginas • 2021
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
    (0)
  • 11,93 €
  • + aprende más y mejor