SOLUTIONS
A and C Phase Workload Summary Correct Answers A Phase -
3 days
- Airframe corrosion inspection
- Flight control cable
- main/tail landing gear
- PAS cables
- #1 LDS rig check
- APU/ IGB / TGB Oil change
- Tail rotor tq check
A sheet Correct Answers Aviation Inspection and Acceptance
Record
1 - BUNO
2 - T/M/S
3 - Reporting Custodian
4 - Oxygen
5 - Fuel quantity and grade
6 - Oil quantity and grade
7 - Date of PIC acceptance
8 - Ordnance/ Special Equipment/ Limits/ Remarks
- QASO (Quality Assurance Safety Observer) Inspected and
signed
9 - Plane Captain Signature
10 - SFF Signature (Off going PIC)
11 - PIC
,Acronym - ACSP Correct Answers Aircraft confined space
program
Acronym - CTPL Correct Answers Central technical
publications library
Acronym - MCO Correct Answers Material control officer
Acronym - MMCO Correct Answers Maintenance/material
control officer
Acronym - MMCPO Correct Answers Maintenance master
chief petty officer
Acronym - MMP Correct Answers Monthly maintenance plan
Acronym - MO Correct Answers Maintenance officer
Acronym - NAMDRP Correct Answers Naval aviation
maintenance reporting program
Acronym - QAO Correct Answers Quality assurance officer
Acronym - RCM Correct Answers Reliability centered
maintenance
Acronym- AMO Correct Answers Assistant maintenance
officer
AD Correct Answers Aviation Machinist Mate - 110
Anything that spins
, - Engines
- Transmission
- Rotor system
ADAMTEO Correct Answers AD - 110
AM - 120
AT - 210
AE - 220
A0 - 230
AE Correct Answers Aviation Electricians Mate - 220
- AFCS
- No Flight / Spread Light
- Electrical Wiring
- Instruments
- Generators
- Battery
- Stab Issues
AM Correct Answers Aviation Structural Mechanic - 120
- Airframe
- ECS
- Struts
- Hyds (suspension and brakes too)
- Flight Controls
- Fluid Pressure in Rotors
- Tires
AMCR Correct Answers Aircraft Material Condition Report