Clean Water Act - Correct answer-1970s law that set into place the regulation of
stormwater
NPDES - Correct answer-Requirements for managing stormwater activity on a
construction site are outlined in the following regulation
Immediately after the project award and before the general contractor begins any
site work - Correct answer-Onsite stormwater pollution prevention plan (SWPPP)
binder should be put together by the general contractor
Flushing a spill down the storm drain - Correct answer-Which of the following is
not a beneficial use of water
Discharge from contaminated ground water - Correct answer-Which of the
following is never an allowable stormwater discharge from a construction site.
All construction activity, inside and outside the building is complete and permanent
stabilization has been verified is adequate to meet permit requirements - Correct
answer-The notice of termination (NOT) can be filed when
, All of the above - Correct answer-You should have a SWPPP for construction
because
Site Specific - Correct answer-A well designed SWPPP should be
After the SWPPP is prepared and before starting construction - Correct answer-The
stormwater notice of intent (NOI) must be submitted
All of the above - Correct answer-Potential pollutant sources stored on a
construction site may include
Seek written approval from the project SWPPP designer and, if required, the
project owner - Correct answer-If you believe stormwater BMP modifications are
necessary, you must
The SWPPP Certification Letter - Correct answer-The document is in the SWPPP
that certifies a general contractors commitment to compliance with the SWPPP is
Protects the site by coordinating timing with construction activities and minimizing
pollutant exposure - Correct answer-Sequencing and scheduling BMP installation
Account for the time it takes to install and/or implement BMPs between each phase
of construction - Correct answer-Factors to consider when creating your schedule
include
Answers Graded A+
Clean Water Act - Correct answer-1970s law that set into place the regulation of
stormwater
NPDES - Correct answer-Requirements for managing stormwater activity on a
construction site are outlined in the following regulation
Immediately after the project award and before the general contractor begins any
site work - Correct answer-Onsite stormwater pollution prevention plan (SWPPP)
binder should be put together by the general contractor
Flushing a spill down the storm drain - Correct answer-Which of the following is
not a beneficial use of water
Discharge from contaminated ground water - Correct answer-Which of the
following is never an allowable stormwater discharge from a construction site.
All construction activity, inside and outside the building is complete and permanent
stabilization has been verified is adequate to meet permit requirements - Correct
answer-The notice of termination (NOT) can be filed when
, All of the above - Correct answer-You should have a SWPPP for construction
because
Site Specific - Correct answer-A well designed SWPPP should be
After the SWPPP is prepared and before starting construction - Correct answer-The
stormwater notice of intent (NOI) must be submitted
All of the above - Correct answer-Potential pollutant sources stored on a
construction site may include
Seek written approval from the project SWPPP designer and, if required, the
project owner - Correct answer-If you believe stormwater BMP modifications are
necessary, you must
The SWPPP Certification Letter - Correct answer-The document is in the SWPPP
that certifies a general contractors commitment to compliance with the SWPPP is
Protects the site by coordinating timing with construction activities and minimizing
pollutant exposure - Correct answer-Sequencing and scheduling BMP installation
Account for the time it takes to install and/or implement BMPs between each phase
of construction - Correct answer-Factors to consider when creating your schedule