ICC Soils General (GR) Part 3 Q & A A SI does not need basic knowledge of - Correct Answer - structural design What is not required of the SI prior to arriving on site - Correct Answer - Meet with contractor Which of the following circumstances warrants contacting the contractor immediately: - Correct Answer - the concrete temperature is over 90 degrees F Who is responsible for reviewing and approving special inspection reports? - Correct Answer - the Building Official (BO) The reports of a technical finding are approved by... - Correct Answer - the Building Official (BO) The statement of special inspections is prepared by the ____ and approved by the ___. - Correct Answer - RDP; BO Which of the following is used to approve a building material not listed in the IBC - Correct Answer - a technical evaluation Who performs structural observations? - Correct Answer - RDP When should the SI immediately notify the contractor? - Correct Answer - When the rebar is not tied correctly A preconstruction meeting is generally conducted by the - Correct Answer - RDP Which of the following does not need to be put in a special inspection report? - Correct Answer - time of inspection The contractor signs a statement of - Correct Answer - responsibility Who signs the special inspection agreement? - Correct Answer - Owner, Special Inspector, and the Contractor Who hires the contractor? - Correct Answer - The owner When can inspections of fabricators be waived? - Correct Answer - When approved by the BO Who is allowed to hire the special inspector? - Correct Answer - RDP and Owner Who administers the special inspection program? - Correct Answer - the Building Department

Mostrar más Leer menos
Institución
ICC REINFORCED CONCRETE
Grado
ICC REINFORCED CONCRETE








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC REINFORCED CONCRETE
Grado
ICC REINFORCED CONCRETE

Información del documento

Subido en
21 de mayo de 2025
Número de páginas
2
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC Soils General (GR) Part 3 Q & A
A SI does not need basic knowledge of - Correct Answer - structural design

What is not required of the SI prior to arriving on site - Correct Answer - Meet with contractor

Which of the following circumstances warrants contacting the contractor immediately: - Correct
Answer - the concrete temperature is over 90 degrees F

Who is responsible for reviewing and approving special inspection reports? - Correct Answer -
the Building Official (BO)

The reports of a technical finding are approved by... - Correct Answer - the Building Official (BO)

The statement of special inspections is prepared by the ____ and approved by the ___. -
Correct Answer - RDP; BO

Which of the following is used to approve a building material not listed in the IBC - Correct
Answer - a technical evaluation

Who performs structural observations? - Correct Answer - RDP

When should the SI immediately notify the contractor? - Correct Answer - When the rebar is not
tied correctly

A preconstruction meeting is generally conducted by the - Correct Answer - RDP

Which of the following does not need to be put in a special inspection report? - Correct Answer -
time of inspection

The contractor signs a statement of - Correct Answer - responsibility

Who signs the special inspection agreement? - Correct Answer - Owner, Special Inspector, and
the Contractor

Who hires the contractor? - Correct Answer - The owner

When can inspections of fabricators be waived? - Correct Answer - When approved by the BO

Who is allowed to hire the special inspector? - Correct Answer - RDP and Owner

Who administers the special inspection program? - Correct Answer - the Building Department
7,51 €
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
gurutech

Conoce al vendedor

Seller avatar
gurutech Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
7 meses
Número de seguidores
0
Documentos
63
Última venta
-

0,0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes