100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Project Management Chapters 1-8 Study Guide Questions With Correct Answers

Puntuación
-
Vendido
-
Páginas
33
Grado
A+
Subido en
03-12-2024
Escrito en
2024/2025

Project Management Chapters 1-8 Study Guide Questions With Correct Answers In which of the following stages are project objectives established, teams formed, and major responsibilities assigned? A) Conceptualizing B) Defining C) Planning D) Executing E) Delivering☑️Correct Ans-B) Defining

Mostrar más Leer menos
Institución
Project Management
Grado
Project Management











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Project Management
Grado
Project Management

Información del documento

Subido en
3 de diciembre de 2024
Número de páginas
33
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Project Management Chapters 1-8 Study
Guide Questions With Correct Answers
In which of the following stages are project objectives established, teams formed, and major
responsibilities assigned?
A) Conceptualizing
B) Defining
C) Planning
D) Executing

E) Delivering☑️Correct Ans-B) Defining


In which of the following stages are you more likely to find status reports, many changes, and
the creation of forecasts?
A) Conceptualizing
B) Defining
C) Planning
D) Executing

E) Delivering☑️Correct Ans-D) Executing


Which of the following choices is not one of the driving forces behind the increasing demand for
project management?
A) Compression of the product life cycle
B) Knowledge explosion
C) Development of third world and closed economies
D) More emphasis on the product and less on the customer

E) Corporate downsizing☑️Correct Ans-D) More emphasis on the product and less on the
customer


Project management is ideally suited for a business environment requiring all of the following
except

,A) Accountability
B) Flexibility
C) Innovation
D) Speed

E) Repeatability☑️Correct Ans-E) Repeatability


Which of the following is the number one characteristic that is looked for in management
candidates?
A) Overall intelligence
B) Works well with others
C) Experience
D) Past successes

E) Good references☑️Correct Ans-B) Works well with others


A common rule of thumb in the world of high-tech product development is that a six-month
project delay can result in a loss of product revenue share of ___ percent.
A) 10
B) 20
C) 33
D) 45

E) 50☑️Correct Ans-C) 33


Integration of project management with the organization takes place with the
A) Master budget
B) Strategy plan
C) Process of managing actual projects
D) Both b and c are correct

E) A, B, and C are all correct☑️Correct Ans-D) Both b and c are correct

,Which of these is not part of the "technical dimension" of project management?
A) WBS
B) Budgets
C) Problem solving
D) Schedules

E) Status reports☑️Correct Ans-C) Problem solving


The advent of project management has been most profound in:
A) Automobile manufacturing
B) Construction
C) Information technology
D) The U.S. Department of Defense

E) Film making☑️Correct Ans-C) Information technology


Which of the following is not considered to be a characteristic of a project?
A) An established objective
B) A clear beginning and end
C) Complex tasks
D) Only for internal use

E) Never been done before☑️Correct Ans-D) Only for internal use


From among the following activities, which is the best example of a project?
A) Processing insurance claims
B) Producing automobiles
C) Writing a term paper
D) Completing a college degree

E) All of these are good examples of projects☑️Correct Ans-C) Writing a term paper

, Which of the following choices is not one of the stages of a project life cycle?
A) Conceptualizing
B) Defining
C) Planning
D) Executing

E) Delivering☑️Correct Ans-A) Conceptualizing


Corporate downsizing has increased the trend toward
A) Reducing the number of projects a company initiates
B) Outsourcing significant segments of project work
C) Using dedicated project teams
D) Shorter project lead times

E) Longer project lead times☑️Correct Ans-B) Outsourcing significant segments of project
work


A series of coordinated, related, multiple projects that continue over extended time intended to
achieve a goal is known as a
A) Strategy
B) Program
C) Campaign
D) Crusade

E) Venture☑️Correct Ans-B) Program


From 1994 to 2009 the trend for projects late or over budget was:
A) Significantly better
B) Slightly better
C) About the same
D) Slightly worse
11,77 €
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
TutorNest

Conoce al vendedor

Seller avatar
TutorNest Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
328
Última venta
-

0,0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes