Branch 3 Structural Pest Control / Laws and Regulations (210) with Correct Solutions
Branch 3 Structural Pest Control / Laws and Regulations (210) with Correct Solutions A written inspection and report of wood destroying pests and organisms shall be delivered in how many days from the date of inspection - Answer -10 Business Days The address of each property inspected or upon which work is completed shall be reported and filed with The Board how many days after the commencement of inspection - Answer -10 Business Days It is unlawful for a registered company to solicit payment from the consumer for any structural fumigation work not actually rendered unless prior to the authorization the consumer is provided what notice? - Answer -Notice: the charge for service that this company subcontracts to another registered company may include the company's charges for arranging and administering such service that are in addition to the direct costs associated with paying the subcontractor. You may accept (company's name) bid or you may contract directly with another registered company licensed to perform the work. In order for a registered company or licensee to commence work on a contract, or sign, issue, or deliver any documents expressing an opinion or statement relating to the absence or presence of wood destroying pests or organisms, what must first take place? - Answer -An inspection has to have been made by a licensed Branch 3 Field Representative or Operator. What is the monetary disciplinary action for failure to report and file with The Board the address of any property inspected or where work completed pursuant to section 8518? - Answer -A fine of not more than $2,500. What is a reinspection - Answer -An inspection of those items previously listed on an original report to determine if the recommendation(s) has (have) been completed For how long is an original inspection valid? - Answer -Four months A registered company has how many days to perform an inspection after inspection is ordered? - Answer -10 business days What is a separated report? - Answer -A report in which the registered company separately identifies each recommendation for corrective measures for each section 1 item (infestation and/or infection that is evident) and for each Section 2 item (condition deemed likely to lead to infestation or infection) that is present. What is a Control Service when related to Wood Destroying Organisms - Answer -A regular reinspection of a property after a report has been made in compliance with section 8516.What are the conditions deemed likely to lead to infestation or infection - Answer -Earth-wood contacts, excessive moisture (including plumbing leaks), cellulose debris, faulty grade levels, evidence of roof leaks, and insufficient ventilation. If structural pest control work is to be done on a property the owner, owners agent, and tenant must be given written notice of what per section 8538(a)? - Answer -1. Pest to be controlled 2. Pesticide(s) proposed to be used, and the active ingredient 3. CAUTION- PESTICIDES ARE TOXIC CHEMICALS statement. For Branch 1 application of pesticides the registered pest control company is required to provide notice per section 8538(a) to who? And how far in advance? - Answer -To the owner, the owner's agent, and tenant (if applicable) within 48 hours of application. Subterranean Termite - Answer -Live underground; make tubes from saliva, soil, and bits of chewe
Escuela, estudio y materia
- Institución
- Branch 3
- Grado
- Branch 3
Información del documento
- Subido en
- 17 de abril de 2024
- Número de páginas
- 21
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
branch 3 structural pest control laws and regula
-
branch 3 structural pest control laws 2024
-
branch 3 structural pest control laws 2025
-
a written inspection and report of wood destroying
Documento también disponible en un lote