100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Resumen

Summary for final exam - BIM part 7U4X0 / 7U1B10

Puntuación
-
Vendido
-
Páginas
8
Subido en
05-07-2023
Escrito en
2022/2023

This document contains a summary of BIM lectures of the 7U4X0 course (old code) / 7U1B10 course (new code) with information of Borrmann's book (chapter 1-6) and slides.

Institución
Grado

Vista previa del contenido

2.1. Building Information Modeling = based on the idea of the continuous use of digital
building models throughout the entire lifecycle of a built facility
- Process
- Model
- Management of the process
Why BIM? – efficiency in manufacturing through: automation, use of information systems,
collaboration tools
Costs of inadequate interoperability: avoidance, mitigation, delay
Semantic information = information that can be interpreted without human intervention
The MacLeamy curve – reduction of failure costs, efficiency gains, shifting the design effort forward
(front – loading) – advantages of BIM over CAD
4D model – associates the individual building components with the scheduled construction times –
collusions can be detected and site logistics can be organized
5D model – additional integrates cost information can be used to simulate the cost development
over time
LOD = ‘level of development’ – level gives an indication of its maturity and reliability (of the digital
model) – six standards: (100, 200, 300, 350, 400, 500)
- LOD 100: The model element is represented graphically by a symbol or a generic
representation. Information specific to the element such as costs per square meter can be
derived from other model elements.
- LOD 200: The model element is represented graphically in the model by a generic element
with approximate dimensions, position and orientation.
- LOD 300: The model element is represented graphically by a specific object that defines its
size, dimension, form, position and orientation.
- LOD 350: The model element is represented graphically by a specific object that defines its
size, dimension, form, position and orientation as well as its interfaces to other building
systems.
- LOD 400: The model element is represented graphically by a specific object that defines its
size, dimension, form, position and orientation along with information regarding its
production, assembly and installation.
- LOD 500: The model element has been validated on the construction site including its size,
dimension, form, position and orientation.

, BIM vs. 3D vs. 2D:
- BIM is (usually) about both 3D and building information
- CAD approaches use 2D drawing elements that later evolved into 3D
- BIM integrates 3D modeling with intelligent data parameters
- 3D CAD represents only graphical entities
- BIM carries information related to the entire building lifecycle
- BIM – co-existence of information from a database and 3D geometry




BIM maturity levels:
- Level 1 – data exchanged by sending and receiving individual files, no central
project platform
- Level 2 – drawings are mostly derived from BIM models. Data exchange still
based on files, however, all files are managed on a central platform (common
data environment – CDE)
- Level 3 – for the future, fully integrated BIM – big open BIM

Libro relacionado

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

¿Un libro?
No
¿Qué capítulos están resumidos?
1 to 6
Subido en
5 de julio de 2023
Número de páginas
8
Escrito en
2022/2023
Tipo
RESUMEN

Temas

3,49 €
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tue2022 Technische Universiteit Eindhoven
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
27
Miembro desde
3 año
Número de seguidores
11
Documentos
43
Última venta
4 meses hace

4,0

1 reseñas

5
0
4
1
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes