100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide

Puntuación
5,0
(2)
Vendido
7
Páginas
70
Grado
A+
Subido en
11-09-2022
Escrito en
2022/2023

WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Total Quality Management (TQM) Philosophy Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." Process Capability Index (Cpk) A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Six Sigma The theoretical maximum output of a system in a given period under ideal conditions. Design Capacity The capacity a firm expects to achieve given its current operating constraints. Effective Capacity proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. Location Analysis A type of process used to produce a large volume of a standardized product. Line Processes A type of process used to produce a small quantity of products in groups or batches based on customer orders or specifications. Batch Processes A type of process used to make a one-at-a-time product exactly to customer specifications. Project Processes A type of process that operates continually to produce a high volume of a fully standardized product. Continuous Processes Longest task in the process. Bottleneck A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Flexible Manufacturing System (FMS) A technique for monitoring the flow of jobs between work centers. Output/Input Control The net increase created during the transformation of inputs into final outputs. Value-Added Layouts that combine characteristics of process and product layouts. Hybrid Layouts Table that reflects opinions of managers with regard to the importance of having any two departments close together. Relationship Chart (REL) The shortest distance between two locations using north-south and east-west movements. Rectilinear Distance Table that gives the number of trips or units of product moved between any pair of departments. From-To Matrix Schematic showing the placement of resources in a facility. Block Plan The average of the observation times for each of the work elements. Mean Observed Times The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Normal Time The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays. Standard Time A philosophy designed to achieve high-volume production through elimination of waste and continuous improvement. Based on a "pull" system rather than a "push" system. The three elements are just-in-time manufacturing, total quality management, and respect for people. Just-in-Time (JIT) A card that specifies the exact quantity of product that needs to be produced. Kanban card A philosophy of neverending improvement. Continuous Improvement Supplies materials or services directly to the processing facility. Tier One Suppliers Directly supplies materials or services to a tier one supplier in the supply chain. Tier Two Suppliers Directly supplies materials or services to a tier two supplier in the supply chain. Tier Three Suppliers Management of the flow of materials from suppliers to customers in order to reduce overall cost and increase responsiveness to customers. Supply Chain Management (SCM) Determines the labor and machine resources needed to fill the open and planned orders generated by the MRP. Capacity Requirements Planning (CRP) A system that uses the MRP, inventory record data, and BOM to calculate material requirements. Material Requirements Planning (MRP) Large software programs used for planning and coordinating all resources throughout the entire enterprise. Enterprise Resource Planning (ERP) Includes the budgeted levels of finished products, inventory, backlogs, workforce size, and aggregate production rate needed to support the marketing plan. Aggregate Plans Businesses to outsource elements of the company's distribution and fulfillment services. specialize in integrated operation, warehousing and transportation services customized to customers' needs based on the demands and delivery service requirements for their products and material Third-Party Logistics (3PL) the world's leading supply chain framework, linking business processes, performance metrics, practices and people skills into a unified structure. The goals are to increase the speed of system implementations, support organizational learning goals, and improve inventory turns. Supply Chain Operations Reference model (SCOR) Initiation, Planning, Execution and Closure. Project Life Cycle Phases A plan for produced in each time period such as production, staffing, inventory, etc. linked to manufacturing where the plan indicates when and how much of each product will be demanded. It gives production, planning, purchasing, and top management the information needed to plan and control the manufacturing operation. Master Production Schedule (MPS) The meaning of quality as defined by the customer. Total Quality Management (TQM) network diagramming notation that places activities in the n

Mostrar más Leer menos
Institución
WGU C215
Grado
WGU C215











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C215
Grado
WGU C215

Información del documento

Subido en
11 de septiembre de 2022
Número de páginas
70
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

10,10 €
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los 2 comentarios
2 año hace

3 año hace

5,0

2 reseñas

5
2
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BrilliantScores Chamberlain College Of Nursng
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2819
Miembro desde
3 año
Número de seguidores
2233
Documentos
16100
Última venta
1 día hace
latest updated documents, correct, verified & graded A study materials

get bundles, documents, test banks, case studies, shadow health's, ATIs, HESIs, study guides, summary, assignments & every kind of study materials.

3,8

774 reseñas

5
388
4
117
3
116
2
37
1
116

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes