Osha contractor construction management Study guides, Study notes & Summaries

Looking for the best study guides, study notes and summaries about Osha contractor construction management? On this page you'll find 100 study documents about Osha contractor construction management.

All 100 results

Sort by

Construction Management Final Exam Latest Update (2023/2024) Graded A Popular
  • Construction Management Final Exam Latest Update (2023/2024) Graded A

  • Exam (elaborations) • 27 pages • 2023
  • Available in package deal
  • Construction Management Final Exam Latest Update (2023/2024) Graded A Why are the MSDS so important for workers to read at the job site? Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the following practices EXCEPT: Testing standards Which of the following is NOT an item of personal protective equipment that might be used by workers on the jobsite? Hardhat, Gloves Which of the following is NOT a typ...
    (0)
  • R193,40
  • 1x sold
  • + learn more
CHST Exam Prep Q&A 2022-2023. CHST Exam Prep Q&A 2022-2023.
  • CHST Exam Prep Q&A 2022-2023.

  • Exam (elaborations) • 39 pages • 2023
  • CHST Exam Prep Q&A 2022-2023. From a safety stand point which of the following is a lagging indicator? - OSHA incidence rate A safety program begins begins by: - Developing a policy statement. How should a manager discipline a first offense minor rule infraction. - Oral reprimand. What is the most important factor in accident prevention. - Management support. Which federal agency is likely user an activity hazard analysis on a construction project? - U.S. Army corps of Engineers ...
    (0)
  • R216,63
  • 2x sold
  • + learn more
CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 71 pages • 2024
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers What Is a pre-solicitation notice? - CORRECT ANSWER The pre-solicitation notice helps government agencies determine if there are qualified vendors to perform the work scope. It provides a "heads up" that the solicitation will be released and solicits capability responses from responsible vendors. The pre-solicitation notice also helps the government determine if the requirement can be set-aside for a small business if capable ...
    (0)
  • R251,48
  • + learn more
 CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT
  • CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 29 pages • 2023
  • Available in package deal
  • CMIT Exam (200 multiple choice) Questions with Verified Answers A CM's role and responsibilities are governed solely by the Owner/CM Agreement. True False - CORRECT ANSWER True There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction management practice. However, there are some key differences. Which of the following do not apply to both CM forms? A) Both forms provide advice to the owner on constructibility, budget and the schedule....
    (0)
  • R232,12
  • + learn more
Contractors Business Law Exam Questions and Answers, Latest Updated 2024/2025 (GRADED A+)
  • Contractors Business Law Exam Questions and Answers, Latest Updated 2024/2025 (GRADED A+)

  • Exam (elaborations) • 15 pages • 2024
  • Contractors Business Law Exam Questions and Answers, Latest Updated 2024/2025 (GRADED A+) How many employees does it take for the Fair Labor Act to be applied? (Ans- 1 What accounting method records income when the service occurs and expense when they are incurred? (Ans- Accrual Method What do the General Conditions of a contract do? (Ans- Outline roles of the owner, architect, and engineer. You are purchasing an insurance policy with a monthly premium of $300. If you implement a safety ...
    (0)
  • R280,51
  • + learn more
CM 2215 - Pecquet - Midterm  Questions With 100% Correct Answers.
  • CM 2215 - Pecquet - Midterm Questions With 100% Correct Answers.

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • What is an OSHA option if they refuse an OSHA inspector on the jobsite? - Answer-OSHA can get a warrant in order to enter the premises Major tool used to measure the safety level in an organization? - Answer-TRIR rates When can a focused inspection be done? - Answer-When it's a construction site Which contractors are required to have an emergency response plan? - Answer-All contractors Which of the following represents a first aid case under OSHA's general recording criteria? A. Receivin...
    (0)
  • R154,68
  • + learn more
NEVADA LAW PORTION CONTRACTOR  CONSTRUCTION MANAGEMENT 2024  QUESTIONS WITH COMPLETE SOLUTIONS  GRADED A+
  • NEVADA LAW PORTION CONTRACTOR CONSTRUCTION MANAGEMENT 2024 QUESTIONS WITH COMPLETE SOLUTIONS GRADED A+

  • Exam (elaborations) • 12 pages • 2024
  • NEVADA LAW PORTION CONTRACTOR CONSTRUCTION MANAGEMENT 2024 QUESTIONS WITH COMPLETE SOLUTIONS GRADED A+ An administrative fine that the board can impose for engaging in business or submitting a bid without a contractors license. - CORRECT ANSWER $1000-$50000 How many days does the employer have to furnish a W-2 if an employee requests a copy - CORRECT ANSWER 30 Business Owners who fail to comply with Workers compensation laws may have to pay fines of up to_______ or have their busi...
    (0)
  • R299,87
  • + learn more
CE 305 all true and false HW's for Exam 1 Questions and Answers
  • CE 305 all true and false HW's for Exam 1 Questions and Answers

  • Exam (elaborations) • 22 pages • 2024
  • CE 305 all true and false HW's for Exam 1 Questions and Answers The construction industry represents about 10 % of the United States GPD (Gross Domestic Product) - Answer-T The architect, is a design professional that typically provides project programming, planning, functional layout, artistic features, and integration of structural, mechanical, and electrical design for most building projects. - Answer-T A single civil engineering firm is typically involved with all the disciplines of ...
    (0)
  • R241,80
  • + learn more
STSC Practice Exam with verified solutions 2024
  • STSC Practice Exam with verified solutions 2024

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • For construction, electrical power tools and cords must: Make use of ground fault circuit interrupters or be part of an assured equipment grounding conductor program If a supervisor is given authority by the General Manager to stop operations on a construction site whenever he or she observes an imminent danger situation. Which of the following correctly identifies that authority? Functional authority As a certified Safety Trained Supervisor, you are expected to Seek methods to ...
    (0)
  • R270,84
  • + learn more
Construction Management Final Exam | 130 Questions with 100% Correct Answers | Verified | Latest Update 2024
  • Construction Management Final Exam | 130 Questions with 100% Correct Answers | Verified | Latest Update 2024

  • Exam (elaborations) • 16 pages • 2023
  • Why are the MSDS so important for workers to read at the job site? - Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the following practices EXCEPT: - Testing standards Which of the following is NOT an item of personal protective equipment that might be used by workers on the jobsite? - Hardhat, Gloves Which of the following is NOT a type of personal protection equipment? - Skin Protection Which o...
    (0)
  • R299,87
  • + learn more