Nyc master Study guides, Study notes & Summaries
Looking for the best study guides, study notes and summaries about Nyc master? On this page you'll find 168 study documents about Nyc master.
All 168 results
Sort by
-
NYC MASTER ELECTRICIAN EXAM| 230 QUESTIONS| WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 34 pages • 2023
- Available in package deal
-
- R251,48
- 3x sold
- + learn more
Type ____ is multiconductor cable identified for use as underground service entrance cable. correct answer: Type USE cable 
 
Knife switch rated for more than 1200 Amps at 250Volts or less correct answer: Can be used only as isolating switch, shall not be opened under load 
 
Track lighting with outlets in a bathroom is not allowed because ? correct answer: Track lighting has receptacle 
 
Where internal combustion engines are used as the prime motor, an on site fuel supply shall be provided ...
-
NYC High Pressure Boiler License Questions with Correct Answers
- Exam (elaborations) • 22 pages • 2023 Popular
- Available in package deal
-
- R251,48
- 1x sold
- + learn more
The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? Correct Answer 10% 
 
How is the main steam pressure gages tested? Correct Answer With an inspectors gage 
 
Who is in charge of the code for any plumbing installations? Correct Answer The nyc plumbing code 
 
When will anchorage or guides be inspected? Correct Answer Annually 
 
How many brass washout plugs does a miniature boiler have? Correct Answer 3 brass washout plugs, 1" in size 
 
How often is...
-
NYC MASTER ELECTRICIAN BUNDLED EXAMS WITH 100% CORRECT ANSWERS
- Package deal • 4 items • 2023
-
- R483,79
- 1x sold
- + learn more
NYC MASTER ELECTRICIAN EXAM WITH 100% CORRECT ANSWERS
nyc food protection exam WITH 100% CORRECT ANSWERS

-
NYC Master Electrical Exam 2024 Questions and Answers 100% Correct
- Exam (elaborations) • 32 pages • 2024
- Available in package deal
-
- R232,12
- + learn more
NYC Master Electrical Exam 2024 Questions and Answers 100% CorrectNYC Master Electrical Exam 2024 Questions and Answers 100% CorrectNYC Master Electrical Exam 2024 Questions and Answers 100% CorrectNYC Master Electrical Exam 2024 Questions and Answers 100% Correctneutral point - ANSWER-The common point on a wye-connection in a polyphase system or midpoint on a single phase, 3-wire system, or midpoint of a single phase portion of a 3-phase delta system, or a midpoint of a 3-wire, direct current s...
-
NYC MASTER ELECTRICIAN EXAM
- Exam (elaborations) • 19 pages • 2023
-
- R241,80
- + learn more
Type ____ is multiconductor cable identified for use as underground service entrance cable. - Answer- Type USE cable 
 
Knife switch rated for more than 1200 Amps at 250Volts or less - Answer- Can be used only as isolating switch, shall not be opened under load 
 
Track lighting with outlets in a bathroom is not allowed because ? - Answer- Track lighting has receptacle 
 
Where internal combustion engines are used as the prime motor, an on site fuel supply shall be provided with an on premise fu...
Make study stress less painful
-
NYC MASTER ELECTRICIAN EXAM QUESTIONS AND ANSWERS 100% ACCURATE
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- R232,12
- + learn more
NYC MASTER ELECTRICIAN EXAM QUESTIONS AND ANSWERS 100% ACCURATENYC MASTER ELECTRICIAN EXAM QUESTIONS AND ANSWERS 100% ACCURATENYC MASTER ELECTRICIAN EXAM QUESTIONS AND ANSWERS 100% ACCURATE 
Type ____ is multiconductor cable identified for use as underground service entrance cable. - ANSWER-Type USE cable 
 
Knife switch rated for more than 1200 Amps at 250Volts or less - ANSWER-Can be used only as isolating switch, shall not be opened under load 
 
Track lighting with outlets in a bathroom is n...
-
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test Spring 2023.
- Exam (elaborations) • 20 pages • 2023
-
- R253,41
- 8x sold
- + learn more
Certificate of Fitness for Citywide Sprinkler Systems (S-12) 
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test Spring 2023. 
 
THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. 
 
RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. 
 
THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. 
 
REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOOR(S) ARE CONSIDERED PLANN...
-
NYC Master Electrical Exam
- Exam (elaborations) • 32 pages • 2023
-
- R251,48
- + learn more
neutral point - Answer- The common point on a wye-connection in a polyphase system or midpoint on a single phase, 3-wire system, or midpoint of a single phase portion of a 3-phase delta system, or a midpoint of a 3-wire, direct current system 
 
In the NEC the words ___________indicate a mandatory requirement - Answer- Shall or shall not 
 
On a four wire Delta connected system with a midpoint of one phase winding is grounded, only the conductor or bus bar having a higher phase voltage the groun...
-
NYC MASTER ELECTRICIAN EXAM Latest 2024 Graded A+
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- R251,28
- + learn more
NYC MASTER ELECTRICIAN EXAM Latest 2024 
Graded A+ 
Type ____ is multiconductor cable identified for use as underground service entrance cable. - 
Type USE cable 
Knife switch rated for more than 1200 Amps at 250Volts or less - Can be used only as 
isolating switch, shall not be opened under load 
Track lighting with outlets in a bathroom is not allowed because ? - Track lighting has 
receptacle 
Where internal combustion engines are used as the prime motor, an on site fuel supply shall be 
prov...
-
NYC MASTER ELECTRICIAN EXAM (2023/2024) RATED A
- Exam (elaborations) • 41 pages • 2023
- Available in package deal
-
- R232,12
- + learn more
NYC MASTER ELECTRICIAN EXAM (2023/2024) RATED A 
Type ____ is multiconductor cable identified for use as underground service entrance cable. Type USE cable 
Knife switch rated for more than 1200 Amps at 250Volts or less Can be used only as isolating switch, shall not be opened under load 
Track lighting with outlets in a bathroom is not allowed because ? Track lighting has receptacle 
Where internal combustion engines are used as the prime motor, an on site fuel supply shall be provided with an ...
-
NYC Master Electrical Comprehensive Exam Solved 100% Correct
- Exam (elaborations) • 32 pages • 2024
- Available in package deal
-
- R251,48
- + learn more
NYC Master Electrical Comprehensive Exam Solved 100% Correct
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study notes too and start uploading now. Discover all about earning on Stuvia