Nccco overhead cranes Study guides, Study notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco overhead cranes? On this page you'll find 39 study documents about Nccco overhead cranes.

All 39 results

Sort by

NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Popular
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed fro...
    (0)
  • R290,19
  • 1x sold
  • + learn more
NCCCO Overhead Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A
  • NCCCO Overhead Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A

  • Exam (elaborations) • 28 pages • 2024
  • Available in package deal
  • NCCCO Overhead Crane Exam (2024 / 2025) Questions and 100% Correct Verified Answers | Grade A Q: According to OSHA, the rated capacity of all overhead cranes shall be? Answer: clearly marked on the side of the crane Q: When attaching spreaders to any load, you must keep in mind of what? Answer: the lower the spreader angle the greater the tension Q: What is the order of hitch strength? Answer: basket, vertical, choker Q: According to OSHA, the maximum hook throat opening must not exceed what? An...
    (0)
  • R154,68
  • + learn more
NCCCO Overhead Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Overhead Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 20 pages • 2023
  • Available in package deal
  • NCCCO Overhead Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A Q: According to OSHA, the rated capacity of all overhead cranes shall be? Answer: clearly marked on the side of the crane Q: When attaching spreaders to any load, you must keep in mind of what? Answer: the lower the spreader angle the greater the tension Q: What is the order of hitch strength? Answer: basket, vertical, choker Q: According to OSHA, the maximum hook...
    (0)
  • R203,08
  • + learn more
NCCCO Core Test (New 2023/ 2024 Update) Practice Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Test (New 2023/ 2024 Update) Practice Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • NCCCO Core Test (New 2023/ 2024 Update) Practice Questions and 100% Correct Verified Answers| Grade A QUESTION What happens to ground bearing pressure if you move a crawler crane from soft ground to harder ground? Answer: It increases QUESTION When may a swivel be used with rotation resistant wire rope? Answer: If the rope manufacturer approves QUESTION What should you do on pick and carry operations? Answer: Keep the boom as short as possible QUEST...
    (0)
  • R203,08
  • + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers.
  • NCCCO Overhead Crane Questions and 100%Correct Answers.

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO Overhead Crane Questions and 100%Correct Answers. Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers Removes power to entire crane. Most loads should be rigged to within how many degrees of level? correct answers 5 According to ASME B30.2, what is the...
    (0)
  • R251,48
  • + learn more
NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A Q: From which two points should the boom be measured? Answer: From the boom hinge pins to the center of the boom tip sheave Q: What is the preferred method of installing wire rope from a reel onto a hoist drum? Answer: The rope runs from the top of the reel to the top of the drum Q: Over which quadrant are truck crane capacities usually greater? Answer: Over the rear. ...
    (2)
  • R203,08
  • + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers.
  • NCCCO Overhead Crane Questions and 100%Correct Answers.

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO Overhead Crane Questions and 100%Correct Answers. Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers Removes power to entire crane. Most loads should be rigged to within how many degrees of level? correct answers 5 According to ASME B30.2, what is the...
    (0)
  • R251,48
  • + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers.
  • NCCCO Overhead Crane Questions and 100%Correct Answers.

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO Overhead Crane Questions and 100%Correct Answers. Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers Removes power to entire crane. Most loads should be rigged to within how many degrees of level? correct answers 5 According to ASME B30.2, what is the...
    (0)
  • R251,48
  • + learn more
NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+
  • NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+ Overhead cranes with more than one hoisting unit shall have what? - Correct Answer its rated load marked on it What is the purpose of the "E" (Emergency) stop on an overhead crane? - Correct Answer removes power to entire crane How often does O.S.H.A. require a written wire rope inspection? - Correct Answer once a month Most loads should be rigged to within how many degrees of level? - Correct Answer five...
    (0)
  • R203,08
  • + learn more
NCCCO Overhead Crane questions with correct answers
  • NCCCO Overhead Crane questions with correct answers

  • Exam (elaborations) • 7 pages • 2023
  • NCCCO Overhead Crane questions with correct answers Overhead cranes with more than one hoisting unit shall have? - Answer Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? - Answer Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answer Removes power to entire crane. Most loads should be rigged to within how many degrees of level? - Answer 5 According to ASME B30.2, what is the safety factor for rigging? - Answer 5...
    (0)
  • R174,04
  • + learn more