Getta byte Study guides, Study notes & Summaries

Looking for the best study guides, study notes and summaries about Getta byte? On this page you'll find 234 study documents about Getta byte.

All 234 results

Sort by

MGMT 404 Week 6 Course Project Part 3 (Includes Sections E and F); The Getta Byte – New Billing System Project (GRADED A) | UPDATED 2023
  • MGMT 404 Week 6 Course Project Part 3 (Includes Sections E and F); The Getta Byte – New Billing System Project (GRADED A) | UPDATED 2023

  • Other • 21 pages • 2023
  • Available in package deal
  • To complete the project schedule, follow the steps below. Watch the video located in “The Getta Byte – Billing System Project Schedule” section of the Week 4: Introduction and The video contains information to complete this section. At timeframe [2:17], the video presents the project schedule for the Getta Byte project. It shows how the scope of the project has been broken down into milestones and work packages; it also presents the duration of each project tasks and the schedule. Enter th...
    (2)
  • R212,32
  • 2x sold
  • + learn more
MGMT 404 Week 4 Course Project Part 2 (Includes Sections C and D); The Getta Byte - New Billing System Project (Version 1).docx
  • MGMT 404 Week 4 Course Project Part 2 (Includes Sections C and D); The Getta Byte - New Billing System Project (Version 1).docx

  • Other • 1 pages • 2023
  • Available in package deal
  • MGMT 404 Week 4 Course Project Part 2 (Includes Sections C and D); The Getta Byte – New Billing System Project Table of Contents Part 2 Section C: Communication Plan Section D: The Project Scope Statement
    (0)
  • R473,12
  • 2x sold
  • + learn more
MGMT 404 Week 6 Course Project; Getta Byte Software Project; Part 3
  • MGMT 404 Week 6 Course Project; Getta Byte Software Project; Part 3

  • Other • 18 pages • 2022
  • Available in package deal
  • Contents Introduction 1.1 Project goals and objectives 1.2 Management of the project 1.3 Internal and external factors that may affect processes and procedure of the project Stakeholder Engagement Plan Communication management plan Project Scope Statement WBS And the Project Schedule 5.1 WBS 5.2 Project scheduling References
    (0)
  • R782,23
  • 1x sold
  • + learn more
MGMT 404 Week 8 COURSE PROJECT The Getta Byte - New Billing System Project (May Submission)
  • MGMT 404 Week 8 COURSE PROJECT The Getta Byte - New Billing System Project (May Submission)

  • Other • 23 pages • 2023
  • Available in package deal
  • The Getta Byte Software gave great insight on a god project charter. Theircurrentmanualsystemhasafewchallengessuchasinaccuraciesintheirdataentriesaswellasbeingtime-consuming.Inaccuratedatacanputthecompanyatgreatriskandtherefore,thiscurrentmanualsystemmustbereplaced.GettaByteSoftwareProject'smainmissionandgoalaretoreplaceits currentmanualbillingsystemwithanonlinesoftware systemthat willenableamoreaccurate,easy,andfastdataentrysystem.Thisupgradeinonlinesoftwarewill enhancetheir dataentry,conceive...
    (0)
  • R386,19
  • + learn more
MGMT 404 Complete Course Project The Getta Byte - New Billing System Project
  • MGMT 404 Complete Course Project The Getta Byte - New Billing System Project

  • Other • 22 pages • 2023
  • Available in package deal
  • Introduction In this introduction, I will talk about the Getta Byte software project. This project's goal is toimplement a new billing system. This billing system will simplify our company's billingproceduresandsaveustimeandmoney.Whenthesoftwareisinstalled,itwillprovideaconcise,simple, and quick data entry system. The system will run on a cloud/VPN network and will beprotected by security redundancies from the ground up. As a result, both the user and theoperator should have a more enjoyabl...
    (0)
  • R347,55
  • + learn more
MGMT 404 COURSE PROJECT The Getta Byte - New Billing System Project (July Submission) Devry
  • MGMT 404 COURSE PROJECT The Getta Byte - New Billing System Project (July Submission) Devry

  • Other • 23 pages • 2023
  • MGMT 404 COURSE PROJECT The Getta Byte - New Billing System Project (July Submission)
    (0)
  • R366,87
  • + learn more
MGMT 404 Week 8 Course Project Part 4 (Sections G and Compilation of Sections A through G) Getta Byte Software Project Devry
  • MGMT 404 Week 8 Course Project Part 4 (Sections G and Compilation of Sections A through G) Getta Byte Software Project Devry

  • Other • 34 pages • 2023
  • Available in package deal
  • 1.1 Projectgoalsandobjectives The Getta Byte Software project is a mission that is formed with the main goal in mind ofreplacing the current manual billing system with an online software-based system that willenable accurate, easy, and fast data entry system. It is worth noting that the existing system hasthe capability of helping the company to carry out the duties in daily operations. This is quitefine, but there are a few challenges that calls for an online system. The first concern is tha...
    (0)
  • R347,55
  • + learn more
 Getta Byte Software Project FINALMGMT404
  • Getta Byte Software Project FINALMGMT404

  • Other • 33 pages • 2022
  • Getta Byte Software Project FINALMGMT404
    (0)
  • R366,87
  • 2x sold
  • + learn more
MGMT 404 Week 6 Course Project Part 3 (Sections E and F) - Getta Byte Software Project (Version 3) Devry
  • MGMT 404 Week 6 Course Project Part 3 (Sections E and F) - Getta Byte Software Project (Version 3) Devry

  • Other • 18 pages • 2023
  • Available in package deal
  • 1.Introduction 1.1 Projectgoalsandobjectives The Getta Byte Software project is a mission that is formed with the main goal in mind ofsubstitutingtheon-goingmanualonline-basedbillingsystemthatwillenableaconcise,easy,andfast data entry system. It is worth noting that the existing system has the capability of helping thecompany to carry out the duties in daily operations. This is quite fine, but there are a fewchallenges that call for an online system. The first concern is that the existing sy...
    (0)
  • R347,55
  • + learn more