Cslb concrete c-8 trade Study guides, Study notes & Summaries

Looking for the best study guides, study notes and summaries about Cslb concrete c-8 trade? On this page you'll find 17 study documents about Cslb concrete c-8 trade.

All 17 results

Sort by

CSLB B Trade Questions and Answers 100% Correct
  • CSLB B Trade Questions and Answers 100% Correct

  • Exam (elaborations) • 107 pages • 2023
  • Available in package deal
  • CSLB B Trade Questions and Answers 100% CorrectCSLB B Trade Questions and Answers 100% CorrectCSLB B Trade Questions and Answers 100% CorrectCSLB B Trade Questions and Answers 100% CorrectLightweight concrete is BEST used at the: A. curb & gutter B. second floor decking C. first floor slab on grade D. footings - ANSWER-B. Second floor decking. It is costly, but very strong. It offers greatest advantage when used for upper stories because it reduces the strength requirements for the suppor...
    (0)
  • R290,19
  • + learn more
CSLB B Exam Practice Questions and Answers Latest Update 2023-2024
  • CSLB B Exam Practice Questions and Answers Latest Update 2023-2024

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • CSLB B Exam Practice Questions and Answers Latest Update . What backfill should be used after concrete forms have been removed? A. Silt B. Gravel C. Clay D. Sand: clay 4. 1. The best type of material to set a house foundation on is: A. Loam/peat B. Clay C. Gravel D. Sand: gravel 5. 1. What does "rough grade" refer to in excavation and grading? A. The natural grade at the worksite B. The grade prior to grading C. The final grade D. The grade approximately conforming to the finish ...
    (0)
  • R280,51
  • + learn more
CSLB B General Practice Questions and Answers | 100% Correct Answers Latest Update 2023-2024
  • CSLB B General Practice Questions and Answers | 100% Correct Answers Latest Update 2023-2024

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • CSLB B General Practice Questions and Answers | 100% Correct Answers Latest Update 2023-2024. It is better to use a leveling rod than a yard stick when using a transit because the rod is: A. Straighter B. Longer C. Easier to read D. Graduated to 64 h: longer 2. 1. Fill dirt is measured in: A. Cubic yards B. Square yards C. Cubic feet D. Square feet: cubic yards 3. 1. What backfill should be used after concrete forms have been removed? A. Silt B. Gravel C. Clay D. Sand: clay 4. 1...
    (0)
  • R357,95
  • + learn more
CSLB B General Practice Questions and Answers (100% Correct Answers) Latest Update 2024 (GRADED)
  • CSLB B General Practice Questions and Answers (100% Correct Answers) Latest Update 2024 (GRADED)

  • Exam (elaborations) • 18 pages • 2024
  • CSLB B General Practice Questions and Answers (100% Correct Answers) Latest Update 2024 (GRADED) It is better to use a leveling rod than a yard stick when using a transit because the rod is: A. Straighter B. Longer C. Easier to read D. Graduated to 64 h: longer 2. 1. Fill dirt is measured in: A. Cubic yards B. Square yards C. Cubic feet D. Square feet: cubic yards 3. 1. What backfill should be used after concrete forms have been removed? A. Silt B. Gravel C. Clay D. Sand: clay 4....
    (0)
  • R299,87
  • + learn more
Sample questions from all CSLB trade exams 2023 rated A+
  • Sample questions from all CSLB trade exams 2023 rated A+

  • Exam (elaborations) • 20 pages • 2023
  • Available in package deal
  • Sample questions from all CSLB trade exams 2023 rated A+The lifting lines should be as vertical as possible When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? A. One lifting line should be horizontal B. The lifting lines should be as far apart as possibles C. The lifting lines should be as horizontal as possible D. The lifting lines should be as vertical as possible Materi...
    (0)
  • R357,95
  • + learn more
CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers

  • Exam (elaborations) • 27 pages • 2023
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers If unused mortar stiffens due to hydration of cement, what must you do? Discard the mortar What minimum time must you wait before caulking or grouting new tiles? 24-48 Hours How long should you wait before installing tile on a shower pan? 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft ...
    (0)
  • R261,16
  • + learn more
CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers

  • Exam (elaborations) • 27 pages • 2024
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers If unused mortar stiffens due to hydration of cement, what must you do? Discard the mortar What minimum time must you wait before caulking or grouting new tiles? 24-48 Hours How long should you wait before installing tile on a shower pan? 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft ...
    (0)
  • R251,48
  • + learn more
CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers

  • Exam (elaborations) • 27 pages • 2024
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers If unused mortar stiffens due to hydration of cement, what must you do? Discard the mortar What minimum time must you wait before caulking or grouting new tiles? 24-48 Hours How long should you wait before installing tile on a shower pan? 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft ...
    (0)
  • R356,02
  • + learn more
CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers

  • Exam (elaborations) • 27 pages • 2024
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers If unused mortar stiffens due to hydration of cement, what must you do? Discard the mortar What minimum time must you wait before caulking or grouting new tiles? 24-48 Hours How long should you wait before installing tile on a shower pan? 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft ...
    (0)
  • R253,41
  • + learn more
CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers

  • Exam (elaborations) • 27 pages • 2024
  • CSLB B License General Contractor Exam Questions and Answers 2022/2023| 100% Correct Verified Answers If unused mortar stiffens due to hydration of cement, what must you do? Discard the mortar What minimum time must you wait before caulking or grouting new tiles? 24-48 Hours How long should you wait before installing tile on a shower pan? 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft ...
    (0)
  • R344,40
  • + learn more