NERC Flashcards (Correctly solved)
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- R202,85
- + learn more
EDE correct answers Energy Deficient Entity 
 
Ime correct answers meter error 
 
DCS correct answers Disturbance Control Standard 
 
DFRs correct answers Digital Fault Recorder 
 
LOFT correct answers Linear on the fly testing 
 
SCADA correct answers Supervisory Control and Data Acquisition 
 
EMS correct answers Emergency Management System 
 
SPS correct answers Special Protection Systems 
 
ACE correct answers Area Control Error 
 
Fs correct answers frequency Schedule 
 
RCIS correct answer...
-
NERC Latest Updated 2022 with Complete Solutions
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- R170,59
- + learn more
NERC Latest Updated 2022 with Complete Solutions EDE Energy Deficient Entity 
Ime meter error 
DCS Disturbance Control Standard 
DFRs Digital Fault Recorder 
LOFT Linear on the fly testing 
SCADA Supervisory Control and Data Acquisition 
EMS Emergency Management System 
SPS Special Protection Systems 
ACE Area Control Error 
Fs frequency Schedule 
RCIS Reliability Coordinator Information System 
IDC Interchange Distribution Calculator 
PSE Purchasing Selling Entity 
NOAA National Oceanic Atmosph...
-
CWEA E/I Level 3 Test Practice (100 OUT OF 100) Questions and Answers (GRADED A+)
- Exam (elaborations) • 16 pages • 2023
-
- R189,57
- + learn more
If the potential difference across the coil is low, the coil will: 
A-draw too much current 
B-become too hot 
C-Produce too much magnetic force 
D-not heat up 
D-not heat up 
 
 
The NEC identifies environments that contain flammable vapors and gases as which class of hazardous location? 
A-Class I 
B-Class II 
C-Class III 
D-Class IV 
A-Class I 
 
 
Which of the following reduces high voltages and currents to save values for measurements? 
A-auto transformer 
B-megohmmeter 
C-instrument transf...
-
CompTIA CySA+ CSO-002 Pre-Assessment Quiz || with 100% Errorless Solutions.
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- R189,57
- + learn more
Kerensa is a systems administrator for a large manufacturer. She oversees the infrastructure for one of the factories where robots assemble the company's products. She is concerned that some of the specialized systems may have vulnerabilities that have not been discovered yet. Which of the following should she implement to achieve the best security possible? correct answers b. Disconnect the SCADA network from the rest of the company's network. 
 
Pratap runs a small business helping homeowner...
-
CISA Practice Exam 559 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 74 pages • 2024
-
- R255,99
- + learn more
CISA Practice Exam 559 Questions with Verified Answers 
 
It is important to understand the organization and its environment in order to effectively pinpoint the organization's key risk. One specific factor is an understanding of: - CORRECT ANSWER The organization's selection and application of policies and procedures 
 
Of the following, which is not a way to treat a risk? - CORRECT ANSWER Ignore it 
 
The three focus areas that management must address in order to govern IT include all of the...
-
NERC FLASHCARDS WITH 100% CORRECT ANSWERS.
- Exam (elaborations) • 8 pages • 2023
- Available in package deal
-
- R303,43
- + learn more
EDE 
Energy Deficient Entity 
 
 
 
Ime 
meter error 
 
 
 
DCS 
Disturbance Control Standard 
 
 
 
DFRs 
Digital Fault Recorder 
 
 
 
LOFT 
Linear on the fly testing 
 
 
 
SCADA 
Supervisory Control and Data Acquisition 
 
 
 
EMS 
Emergency Management System 
 
 
 
SPS 
Special Protection Systems 
 
 
 
ACE 
Area Control Error 
 
 
 
Fs 
frequency Schedule 
 
 
 
RCIS 
Reliability Coordinator Information System 
 
 
 
IDC 
Interchange Distribution Calculator 
 
 
 
PSE 
Purchasing Selling E...
-
NCCER INSTRUMENTATION questions with complete solutions 2023/2024
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- R189,57
- + learn more
NCCER INSTRUMENTATIONa. SCADA 
b. WAN 
c. Peer-to-peer 
d. Fieldbus 
A technology bypassing conventional I/O by using direct communications between smart field devices and associated control processors is: 
 
 
a. In pairs in the same enclosure 
b. In a master-slave relationship at assigned locations 
c. As a hot standby at the central processor. 
d. On a different communications segments. 
Redundant controllers in a distributed control system reside: 
 
 
a. Naylor and Tunstall 
b. Mitchem and ...
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
- Available in package deal
-
- R227,52
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
CISA Domain 2 Exam 100 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 16 pages • 2024
-
- R218,03
- + learn more
CISA Domain 2 Exam 100 Questions with Verified Answers 
 
What does EGIT stand for? What is it's meaning? - CORRECT ANSWER Enterprise Governance of Information and Technology. It a system composed of stakeholders, board of directors, department managers, and internal customers who provide input into the IT decision making process. 
 
What are the three broad processes in the EGIT framework are: - CORRECT ANSWER 1. IT Resource Management - Focuses on maintainng an updated inventory of all IT res...
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
- Available in package deal
-
- R199,06
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...