• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

ICC California UST Service Technician Certification Exam 2025/2026: 150 Actual Questions and Verified Answers (A+ Grade)

Document preview thumbnail
Preview 2 out of 11 pages

Ace your ICC California Underground Storage Tank (UST) Service Technician certification exam with this comprehensive preparation guide. This document features 150 actual exam questions and detailed, verified answers for the 2025/2026 test cycle, ensuring you are fully prepared to achieve an A+ grade. Inside, you'll find critical information on: Vapor Recovery Systems (Stage I & II, VR-201-A, VR-101-E) Release Detection & Monitoring (ATG, SIR, Line Leak Detectors) Secondary Containment & Overfill Protection UST Installation, Repair, and Testing Regulations Health & Safety Codes and Executive Orders Record Keeping and Reporting Requirements Ideal for UST service technicians, tank testers, and facility operators in California, this guide is your key to understanding the complex state and federal regulations and passing the ICC certification exam with confidence.

Content preview

1 of 11


ICC CALIFORNIA UST SERVICE TECHNICIAN CERTIFICATION/ ICC CALIFORNIA UST
SERVICE TECHNICIAN CERTIFICATION 2025/2026 EXAM PREPARATION ACTUAL
EXAM 150 QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED
ANSWERS) |A+GRADE

The annual monitor certification may be performed by? - ......ANSWER........A person
possessing the appropriate contractor's license. An individual trained and certified by the
manufacture of the monitoring equipment.

The following is true of secondary containment EXCEPT: - ......ANSWER........Must be
tested every 24 months.

Enhanced the detections results must be submitted to ___ within ___days
- ......ANSWER........The local agency and State water resources control Board. 60

The EPA recommends that monthly the operator should conduct a walk-through
inspection of the following EXCEPT: - ......ANSWER........Facility lighting

Cathodic protection systems must be tested within ____Months of installation and every
____months thereafter. - ......ANSWER........6, 36

Impressed current catholic protection systems shall be expected no less then every?
- ......ANSWER........30 days

The EPA suggested list of supplies for spill containment and clean up include all the
following EXCEPT: - ......ANSWER........Wet dry shop vacuum

According to the health and safety code the owner of a new tank must conduct a onetime
ELD test if the tank is located within 1000 ft of a public drinking water well. This test must
be accomplished by? - ......ANSWER........January 1, 2005

The following is true of SIR data. - ......ANSWER........Must be submitted monthly to
reconciliation provider.

Records of protection systems maintenance must be kept on file for?
- ......ANSWER........6.5 years

Tank repair and upgrade records that Demonstrate compliance with title 23 regulations
must be maintained? - ......ANSWER........For the life of a tank

, 2 of 11


Records for performance on release detection systems must be kept on file for?
- ......ANSWER........5 years

Monthly monitoring data must be kept on file for? - ......ANSWER........3 years

UST systems records must be maintained on site or? - ......ANSWER........At a location
approved with the local agency

A written statement indicating SIR results must be submitted to the every
- ......ANSWER........Local agency, 12 months

The following are overfilling protection systems EXCEPT: - ......ANSWER........Spill buckets

I do a ____ after replacing a spout to a Healy 900 nozzle - ......ANSWER........shut off test

In a balance hose the gasoline flows in - ......ANSWER........Inner hose

After the installation of the vapor piping and before back filling, PEI 300 suggests some
methods to document piping layout, except? - ......ANSWER........Drawing with a pen, pipe
layout on the cover of the tank manual.

During VO-1000 you don't - ......ANSWER........Work without eye protection

An Overfill Alarm device needs to be located - ......ANSWER........Where it can be heard or
seen by the delivery location.

When in a GDF you can avoid the installation of UDC? - ......ANSWER........No exceptions of
any GDF.

What is considered an Underground Storage Tank? - ......ANSWER........Tank and pipping
only

Gasoline vapors are 3/4 times _____ than air - ......ANSWER........Heavier

Compounds with a high vapor pressure such as gasoline will evaporate readily and will
typically - ......ANSWER........Have a low Flashpoint.

Document information

Uploaded on
October 28, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
R393,29

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
6
Followers
0
Items
159
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions