100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

RSK4804 Assignment 2 |100% Complete Answers| 2025 (865771) - DUE 30 August 2025

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
11-07-2025
Written in
2024/2025

Credit Risk Management - RSK4804 Assignment 2 2025 (865771) - DUE 30 August 2025; 100 % TRUSTED workings, Expert Solved, Explanations and Solutions. For assistance call or W.h.a.t.s.a.p.p us on ...(.+.2.5.4.7.7.9.5.4.0.1.3.2)........... credit risk, credit default swaps, CDS, portfolio return, standard deviation, portfolio beta, infrastructure project, project risk, risk mitigation, cash conversion cycle, working capital, project finance, economic development, financial analysis, Nairobi Expressway, Moepi Minerals, Emfulweni Commercial Bank, Geelhout Fabriek, UNISA, RSK4804, assignment answers This document provides comprehensive, fully humanised answers to the RSK4804 Assignment 2 (2025) for the University of South Africa (UNISA). The assignment focuses on fundamental aspects of credit risk management, including the role of credit default swaps, portfolio risk metrics, and project finance risks and mitigants. It also includes a site-specific case study of the Nairobi Expressway Project and a financial evaluation of a company’s working capital cycle. All answers are structured clearly and include financial calculations, interpretations, and practical examples. The document is aligned with academic requirements and written in a professional, easy-to-understand format.

Show more Read less









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
July 11, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

RSK4805
ASSIGNMENT 2 2025

UNIQUE NO. 865771
DUE DATE: 30 AUGUST 2025

,Credit Risk Management

Question 1

a. Credit default swaps (CDS) are vital financial instruments in credit risk management.
They offer a means for investors to hedge against the risk of default by a borrower. A
CDS acts like insurance: if a borrower defaults, the CDS seller compensates the buyer.
They also promote liquidity in bond markets and help with credit pricing (Hull, 2018).

b. Some investors oppose CDS due to systemic risk concerns. Speculation without
owning the underlying asset can destabilize markets. Additionally, they may introduce
moral hazard and lack transparency in over-the-counter markets (Stulz, 2010).

c. In the event Moepi Minerals defaults, Sedibelo Development Bank (the CDS seller)
pays the difference between the bond’s par and recovery value to Magong Platinum
Project. If no default occurs, Magong pays an annual premium (2.5% of R80m = R2m)
for three years (total R6m) and retains default protection.

Question 2

a. The portfolio’s expected return is calculated as follows:
E[Rp] = (0.45 × 0.12) + (0.20 × 0.08) + (0.35 × 0.13) = 11.55%
Portfolio variance:
σ² = (0.45² × 0.14²) + (0.20² × 0.13²) + (0.35² × 0.17²) + 2(0.45×0.20×0.02) +
2(0.45×0.35×0.04) + 2(0.20×0.35×0.03)
σ² ≈ 0.04296 → σ ≈ 20.72%

b. Credit portfolio beta measures how sensitive a credit portfolio is to systemic market
movements. It helps assess potential losses during downturns and guides asset
allocation strategies (Jarrow & Turnbull, 2000).

, Question 3

a. Project: Nairobi Expressway, Kenya
Location: Nairobi City
Project Sponsors: China Road and Bridge Corporation (CRBC), Kenyan Government
Project Lenders: Industrial and Commercial Bank of China
Consultants: Kenya Urban Roads Authority (KURA), Ministry of Transport

b. Risks and mitigants:
- Construction risk: mitigated by EPC contracts
- Political risk: mitigated by treaties and insurance
- Demand risk: addressed with revenue guarantees
- Environmental risk: controlled via EIA compliance
- Legal risk: managed through proper contract terms

c. Advantages:
- Reduced travel time and traffic
- Job creation
- Attraction of foreign investment
- Regional economic development
- Increased government revenue

Question 4

Average Inventory = (26+24)/2 = 25m
Average Receivables = (25+23)/2 = 24m
Average Payables = (16+18)/2 = 17m
COGS = 60% of R150m = R90m

Inventory Conversion Period = (25/90)*365 ≈ 101.39 days
Receivables Period = (24/150)*365 ≈ 58.4 days
Payables Period = (17/90)*365 ≈ 68.9 days

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LIBRARYpro University of South Africa (Unisa)
View profile
Follow You need to be logged in order to follow users or courses
Sold
10518
Member since
2 year
Number of followers
4904
Documents
4814
Last sold
1 week ago
LIBRARY

On this page, you find all documents, Package Deals, and Flashcards offered by seller LIBRARYpro (LIBRARY). Knowledge is Power. #You already got my attention!

3,7

1457 reviews

5
683
4
235
3
243
2
78
1
218

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions