100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Judgments

Construction_Technology_2.

Rating
-
Sold
-
Pages
2
Uploaded on
01-11-2023
Written in
2023/2024

Construction_Technology_2.









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
November 1, 2023
Number of pages
2
Written in
2023/2024
Type
Judgments

Content preview

All Rights Reserved


TERTIARY AND VOCATIONAL EDUCATION COMMISSION

COMMON WRITTEN EXAMINATION – 2021/ 2022


Diploma in Quantity Surveying

NVQ Level 05 –Semester I `

Construction Technology 1 F45C002M03 Three Hours


Answer any five (5) questions only
.
1. i) The basement excavation of a high-rise building is 2-3m deep and excavation has to be
commenced soon.
a) What are the main activities to be performed to accomplish the excavation work?
(04 marks)
b) Name the resources required for each of them. (04 marks)
c) What are the challenges you may face while executing excavation? (04 marks)
ii) Staircase is a mode of connection of two different elevations and to move safely. Draw a
sketch of one (01) type of it and name the parts. (08 marks)

2. i) Concreting of a floor slab is planned and it is the responsibility of the technical staff to
ensure the quality of the end product.
a) Briefly explain the list of activities/ items that should be checked, a day before
concreting; (06 marks)
b) What are the actions you should take to ensure the quality when the concreting is
progressing? (04 marks)
ii) Draw a sketch of English bond and Flemish bond of the right angle corner of the 225mm
thick wall. (10 marks)

3. Multi story construction project with underground car park has been decided to construct in
Malabe. Soil investigation report indicates that the soil condition is very weak and distance
to the bedrock is too far. Design team discussed about the pad foundation, raft foundation &
pile foundation.
a) Name most suitable foundation type for this location and briefly explain why do you select
this type of foundation (05 marks)
b) Name most suitable retaining wall for this project and briefly explain, why do you select
this type of retaining wall (05 marks)
ii) a) State two types of pile foundations made in constructions (02 Marks)
b) Earth can be retained by itself. How to retain it (03 Marks)
c) What is the difference between hand mixing concrete and machine mixing concrete?
(02 Marks)
d) Name three earth retaining structures (03 Marks)

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyabroad Oxford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
67
Member since
4 year
Number of followers
29
Documents
1985
Last sold
1 week ago
schoooldays

shop affordably

5,0

2 reviews

5
2
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions